VMware Certified Advanced Professional 6.5 - Data Center Virtualization Design - 3V0-624 Exam Practice Test
A solution architect has finished conducting interviews and gathering requirements for a company, and has determined that the logical requirements are:
* two data centers for high availability
* synchronous replication to meet the zero-minute RPO
* separating management workloads from application workloads
* dedicated 10Gb uplink for each low latency server
* single management port for the entire environment
Which two actions would meet the design requirements? (Choose two.)
* two data centers for high availability
* synchronous replication to meet the zero-minute RPO
* separating management workloads from application workloads
* dedicated 10Gb uplink for each low latency server
* single management port for the entire environment
Which two actions would meet the design requirements? (Choose two.)
Correct Answer: A,D
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
Recommend in order to allow multicast snooping to enhance multicast performance in vSphere 6.5?
Correct Answer: D
Vote an answer
Customer Information
The Customer labtown is looking to purchase a new storage system and has hired you to create a logical design. Labtown requires no single points of failure when it comes to the fabric connecting the storage. Labtown has already decided that the new storage system will be using fibre to re-use as much of the previous hardware as possible to increase ROI. Labotwn would also like a tiered disk system broken into three categories with the database sitting in the fastest tier, the two web servers sitting in the medium tier, and the file server sitting in the slowest tier.
Create a logical design for Labtowns new Storage System
Requirements
- Create a tiered storage system for Labtown - No single points of failure - Insure storage performance SLA's are met with the four line of business VM's Instructions
- Place VM's on the bottom of the page and connect them with the connector to the storage LUN they will belong to.
- Connect the storage LUN with the service processor with the connector
- Connect the storage processors to the SAN switch
- Place HBA's just below the host, as long as they are close to the host points will be scored
- Connect HBA's to SAN switches with either the Fixed, MRU, or RR Connector to dictate the PSP Policy for storage on the ESXi host.
The Customer labtown is looking to purchase a new storage system and has hired you to create a logical design. Labtown requires no single points of failure when it comes to the fabric connecting the storage. Labtown has already decided that the new storage system will be using fibre to re-use as much of the previous hardware as possible to increase ROI. Labotwn would also like a tiered disk system broken into three categories with the database sitting in the fastest tier, the two web servers sitting in the medium tier, and the file server sitting in the slowest tier.
Create a logical design for Labtowns new Storage System
Requirements
- Create a tiered storage system for Labtown - No single points of failure - Insure storage performance SLA's are met with the four line of business VM's Instructions
- Place VM's on the bottom of the page and connect them with the connector to the storage LUN they will belong to.
- Connect the storage LUN with the service processor with the connector
- Connect the storage processors to the SAN switch
- Place HBA's just below the host, as long as they are close to the host points will be scored
- Connect HBA's to SAN switches with either the Fixed, MRU, or RR Connector to dictate the PSP Policy for storage on the ESXi host.
Correct Answer: B
Vote an answer
After the vSAN iSCSI Target service is enabled, which statement about iSCSI networks is true?
Correct Answer: D
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
A university is going through an IT transformation project and is re-evaluating how to use technology to provide a better academic experience for its 15,000 students. The university is a current VMware customer and has a single data center.
* Within that data center, the university is using blade servers backed by a Fibre Channel array for its business critical applications
* It has two iSCSI arrays (one for the development environment and other for the no-critical production environment)
* The university's VMware environment consists of three clusters. The first cluster contains all development virtual machines (VMs), the second cluster is dedicated to DMZ VMs, and the final cluster contains production VMs
* The university requires the ability to perform hardware maintenance without a service interruption, and can only sustain 4 minutes of downtime per month From the list below, which three are constraints? (Choose three.)
* Within that data center, the university is using blade servers backed by a Fibre Channel array for its business critical applications
* It has two iSCSI arrays (one for the development environment and other for the no-critical production environment)
* The university's VMware environment consists of three clusters. The first cluster contains all development virtual machines (VMs), the second cluster is dedicated to DMZ VMs, and the final cluster contains production VMs
* The university requires the ability to perform hardware maintenance without a service interruption, and can only sustain 4 minutes of downtime per month From the list below, which three are constraints? (Choose three.)
Correct Answer: B,C,D
Vote an answer
A business organization has different types of network traffic, and all the types of traffic must be kept separated. The design architect knows that the number of required networks is greater than the number of physical ports in the system.
Which three choices can the architect use to keep the traffic separated? (Choose three.)
Which three choices can the architect use to keep the traffic separated? (Choose three.)
Correct Answer: B,C,D
Vote an answer