SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 - C_TSCM42_67 Exam Practice Test
What are the consequences of setting a production order to Technically Complete (TECO)? (Choose three)
Correct Answer: A,C,D
Vote an answer
Which of the following properties about the planning functions available in SAP ECC applies?
Correct Answer: D
Vote an answer
In the Customizing for requirements planning, a project team notices that the alternatives P1, P2, P3 and P4 are also delivered as standard in addition to MRP type PD. The number in each of these alternatives represents a firming type.
What does a firming type define? (Choose two)
What does a firming type define? (Choose two)
Correct Answer: B,C
Vote an answer
You create a routing that includes five operations in an initial sequence (10, 20, 30, 40, 50). When capacity bottlenecks occur, you want to use a second sequence on other work centers for operations 30 and 40.
Which sequence category do you use to create the second sequence in the system?
Which sequence category do you use to create the second sequence in the system?
Correct Answer: D
Vote an answer
In which scenario will the error message shown in the attached screenshot occur?
Exhibit:

Exhibit
Exhibit:

Exhibit
Correct Answer: C
Vote an answer
What is a feature of the simu-lation mode for material requirements planning in SAP ECC?
Correct Answer: B
Vote an answer