ISEB ISTQB-BCS Certified Tester Foundation Level - ISEB-SWT2 Exam Practice Test
A garden irrigation system allows the user to specify 2 inputs:
1. Frequency - The number of times the system should be automatically switched on per day; minimum once per day, maximum 5 times
2. Duration - The duration of operation, in whole minutes, each time it is switched on; ranging from 1 to 60
Applying 2-value boundary value analysis which of the following options has the correct test set of valid and invalid boundary values?
1. Frequency - The number of times the system should be automatically switched on per day; minimum once per day, maximum 5 times
2. Duration - The duration of operation, in whole minutes, each time it is switched on; ranging from 1 to 60
Applying 2-value boundary value analysis which of the following options has the correct test set of valid and invalid boundary values?
Correct Answer: A
Vote an answer
Which of the following is usually the test basis for integration testing?
Correct Answer: D
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
Which of the following statements best characterises maintenance testing? [K2]
Correct Answer: B
Vote an answer
Which one of the following roles is typically used in a review?
Correct Answer: D
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
Which of the following is NOT a typical key challenge for testing in a RAD based development approach? 1 credit
Correct Answer: A
Vote an answer
Which of the following would you expect to see in the master test plan? 1 credit
Correct Answer: D
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
Which of the following is NOT a valid objective of testing?
Correct Answer: C
Vote an answer
Which of the following product risks would be most effectively addressed just by static testing? 3 credits
Correct Answer: D
Vote an answer
Which activities form part of test planning?
i) Developing test cases.
ii) Defining the overall approach to testing.
iii) Assigning resources.
iv) Building the test environment.
v) Writing test conditions.
i) Developing test cases.
ii) Defining the overall approach to testing.
iii) Assigning resources.
iv) Building the test environment.
v) Writing test conditions.
Correct Answer: C
Vote an answer
As part of the test strategy, entry and exit criteria will be defined for each test level. Which is NOT a valid reason for using entry and exit criteria? 1 credit
Correct Answer: A
Vote an answer