CompTIA Server+ Certification - SK0-004 Exam Practice Test
A server failed Thursday evening before the nightly backup. The backup scheme in place was full backups every Sunday, incremental backups on Monday, Wednesday, and Friday, and differential backups on Tuesday, Thursday, and Saturday. To fully restore the server, which of the following is the LEAST amount of backup sets required?
Correct Answer: B
Vote an answer
The shortest time to recovery method in the event of a complete datacenter failure is to utilize a:
Correct Answer: E
Vote an answer
Which of the following is a benefit of using raised floors with specially configured tiles in a server room?
Correct Answer: D
Vote an answer
A server administrator wants to isolate a SAN hosted LUN to be visible to only a single host. Which of the following methodologies would be used to present the LUN to only that host?
Correct Answer: B
Vote an answer
An administrator has encountered a problem with a particular piece of software installed on the server and begins the troubleshooting process. Which of the following is the FIRST place the administrator should look for specific information about the problem?
Correct Answer: A
Vote an answer
Which of the following is the FIRST thing that should be done in order to begin reinstalling TCP/IP on the server?
Correct Answer: B
Vote an answer
Users have reported that the speed on a server is too slow for an application. After examining the server, the server technician determines that the server has SATA drives. Which of the following types of drives should the technician install to improve the server's performance?
Correct Answer: B
Vote an answer
A server technician is trying to minimize power outages using a UPS that is plugged into an outlet in the server room. Given this scenario, which of the following procedures should be followed to minimize outages?
Correct Answer: B
Vote an answer
A USB drive has been purchased to move files between Windows, *nix, and Macintosh servers. Which of the following filesystems is the BEST choice to ensure the drive can read and be written to by all of the servers?
Correct Answer: C
Vote an answer
An administrator needs to perform a backup of all servers for an upcoming disaster recovery exercise at a company cold site. Which of the following types of backup should be performed?
Correct Answer: C
Vote an answer
A systems administrator is troubleshooting a server that will not turn on. The LED lights are not blinking, and no status light indicators are available. The administrator has checked the PDU and UPS to verify proper functionality. Which of the following components is the MOST likely cause of this problem?
Correct Answer: A
Vote an answer
A server technician is procuring rail kits for a 2U rack mount server. Company policy dictates all rail kits must allow full extension of the system out of the rack. Given these requirements, which of the following rail kit types should the technician obtain?
Correct Answer: B
Vote an answer
Which of the following is a reason to have a remote cold site readily available in case of a disaster in the primary datacenter?
Correct Answer: C
Vote an answer
A datacenter has exceeded the load on the central uninterruptible power supply (UPS) for the room and is causing power load problems. Additional power is available, but not using the central UPS. Which of the following is the BEST temporary solution for adding new servers until an upgrade of the central UPS can occur?
Correct Answer: C
Vote an answer