Oracle Manufacturing and Maintenance Cloud 2019 Implementation Essentials - 1Z1-1075 Exam Practice Test
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs
executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to
prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.
executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to
prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.
Correct Answer: A,B
Vote an answer
Your customer has completed the required setup steps for automatic work definition. Identify the option that
shows the navigation steps needed to create an automatic work definition.
shows the navigation steps needed to create an automatic work definition.
Correct Answer: A
Vote an answer
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where
actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.
actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.
Correct Answer: D
Vote an answer
During a Manufacturing Cloud implementation, the Production Supervisor wants to close the work orders for
last month and wants to make sure that the work orders include the correct cost.
Identify the approach to be taken by the Production Supervisor.
last month and wants to make sure that the work orders include the correct cost.
Identify the approach to be taken by the Production Supervisor.
Correct Answer: D
Vote an answer
Which entity should you use to configure the manufacturing plant in Functional Manager?
Correct Answer: C
Vote an answer
In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a
product. The cost of the assembly is calculated by using the standard costing method. The work definition and
resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing
estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up
costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.
product. The cost of the assembly is calculated by using the standard costing method. The work definition and
resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing
estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up
costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.
Correct Answer: D
Vote an answer
In a manufacturing plant, a production operator in a given shift completes a car assembly and reports this using
orderless completion by referencing a Work Definition.
Identify the two purposes of the referenced Work Definition in Orderless reporting.
orderless completion by referencing a Work Definition.
Identify the two purposes of the referenced Work Definition in Orderless reporting.
Correct Answer: D,E
Vote an answer