Oracle EBS R12: Advanced Supply Chain Planning - 1z1-244 Exam Practice Test
Identify four costs from the source system that are considered by an ASCP Optimized Plan.
Correct Answer: A,B,C,D
Vote an answer
You have Late Replenishment for Sales Orders exceptions In a constrained plan. Which two methods could be used to find the cause of the lateness?
Correct Answer: D
Vote an answer
Identify the element that does NOT belong to a Demand plan from Oracle Demand Planning.
Correct Answer: A
Vote an answer
Select two correct statements about standard operations.
Correct Answer: B,C
Vote an answer
Your client has a demand to be satisfied in the future. The plan is a constrained plan, and the Enforce Demand Due Dates check box Is enabled. The plan Issued a supply order to satisfy the above demand with the insufficient lead time exception message. The planning engine compressed the lead times for two of the machine resources to meet the demand due date. There are no other supply orders that have the same exception message.
Your client has the following requirements:
1) The processing times of any operation cannot be compressed.
2) There are no additional machine resources to use.
3) The customer for the above order is willing to receive the order within the minimal possible late days.
Identify the best option in the above scenario.
Your client has the following requirements:
1) The processing times of any operation cannot be compressed.
2) There are no additional machine resources to use.
3) The customer for the above order is willing to receive the order within the minimal possible late days.
Identify the best option in the above scenario.
Correct Answer: D
Vote an answer
You are preparing to launch your ASCP plan, which Is constrained. Which three statements are correct In this context?
Correct Answer: A,B,E
Vote an answer
This controls the effects of abnormal demand with a maximum percent of the original quantity forecast that a single Sales Order can consume.
What is referred to in the above statement?
What is referred to in the above statement?
Correct Answer: B
Vote an answer
Identify four statements that are true for Orders with Compression exceptions with respect to the unconstrained plan.
Correct Answer: B,C,F,G
Vote an answer
In a combination of forecasts for one Item, the Planning Manager consumes forecast entries according to the following procedural list:
1. It consumes the entries on the sales order line schedule date (or within the same week or period).
2. It consumes the entries on the forward consumption days (or within the same week or period).
3. It consumes the entries on the backward consumption days (or within the same week or period).
Note: No other setups are performed for consumption. Identify the correct order of consumption.
1. It consumes the entries on the sales order line schedule date (or within the same week or period).
2. It consumes the entries on the forward consumption days (or within the same week or period).
3. It consumes the entries on the backward consumption days (or within the same week or period).
Note: No other setups are performed for consumption. Identify the correct order of consumption.
Correct Answer: D
Vote an answer