IBM Assessment: IBM Sterling B2B Integrator V5.2, Solution Implementation - A2060-218 Exam Practice Test

A developer has set up a File System Adapter tomonitor a specific folder on the file system.
When a file arrives in the folder, a Business Process (BP) will be executed. Where will the
file payload be available to the rest of the BP?

Correct Answer: C Vote an answer
Due to a rise in fraud, a financial company riskmanagement team is looking to implement more stringent security measures. What are two security features to address the fraud? (Choose two.)

Correct Answer: B,D Vote an answer
A developer needs to export all versions of a Business Processes (BP). Which two formats can be selected within Resource Manager for exporting objects from IBMSterling B2B Integrator (SBI)? (Choose two.)

Correct Answer: A,B Vote an answer
An administrator at a company wants to receive batch email notifications containing the current Business Process (BP) state for BP that do not have the ompleted?or erminated?state by the time their deadline expires. The administrator asks the developer to modifythe ?ompleted?or ?erminated?state by the time their deadline expires. The administrator asks the developer to modify customer_overrides.properties in order to set up the batch notifications. Which configurations will meet the administrator's requirements?

Correct Answer: B Vote an answer
A developer has created and deployed a LWJDBC adapter with only result_name and
row_name defined. The developer has opened the configuration setting for this LWJDBC in the Graphic Process Modeler (GPM) and put this into the SQL parameter SELECT * FROM CERTTEST WHERE TEST = O? ?O? Which other parameters need to be configured?

Correct Answer: B Vote an answer
A developer is testing an IBM Sterling B2B Integrator (SBI) Business Process (BP) that was created using the Graphical Process Modeler (GPM). The developer is attempting to extract the Primary Document containedin Process Data to a file system folder using a File System Adapter (FSA). In the File System Adapter Service Editor and/or Service Configuration the developer has assigned values to the parameters for the Action (Extract), extraction folder and for the file name to name the extracted file. However, the process is failing at the FSA with an error indicating that the Primary Document is null or doesn exist.Document is null or doesn? exist. The developer has verified that the Primary Document does exist. What is the most likely cause of the error?

Correct Answer: B Vote an answer
A developer is using a Doc Keyword Replace Service to replace an @ with a ~ in an EDI file inside the Graphical Process Modeler (GPM). The base configuration does not have settings for the keyword and replace settings. Where in the GPM can the developer add service settings into the BPML?

Correct Answer: A Vote an answer

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어