IBM Assessment: Power Systems Virtualization Technical Support for AIX and Linux -v2 - A4040-109 Exam Practice Test

How can an existing AIX 5.2 LPAR, which is using SAN storage, be migrated into a versioned WPAR (Workload Partition)?

Correct Answer: D Vote an answer
An administrator must create several production and development LPARs on a new Power 770 server. Processor requirements for the development LPARs change frequently.
Which configuration will isolate the production LPARs from changes in processing requirements for the development LPARs?

Correct Answer: C Vote an answer
A customer has two Power 770 systems in their environment. What is the minimum PowerVM version that will enable a flexible environment that can allow for seamless hardware maintenance?

Correct Answer: A Vote an answer
A production application is hosted across two Power 750 Express servers, managed by an HMC. Each machine has 16 cores and 32GB RAM. Four 8GB LPARs are defined across the two systems and only 3 LPARs are active at once. Live Partition Mobility is used to maintain availability when maintenance is required.
A test environment is being built across two Power 550 Express servers.
Each machine has 8 cores and 16GB RAM. Four 4GB LPARs will be defined across the two systems, again only 3 will be active at once. To isolate the test and production environment, the test environment is managed by two IVMs.
Two LPARs have been created on each test server. The administrator initiates a Live Partition Mobility operation to test moving LPARs between the servers.
The migrlpar command fails to migrate the 4th LPAR with the following error:
"The target managed system does not have enough available memory to create the partition."
Because the 4th LPAR was inactive, it was expected that an inactive migration would be successful.
Why would this inactive migration fail on the test environment, but succeed on the production environment?

Correct Answer: C Vote an answer
An architect is considering whether to specify vSCSI or NPIV for the rootvg disks in a new virtualized environment. Storage is to be provided by an IBM San Volume Controller (SVC) and controlled using SDDPCM.
Which of the following is an advantage of using vSCSI technology instead of NPIV?

Correct Answer: D Vote an answer
An architect is looking at the implications of uncapped weights for a new POWER7 system. The system will consist of four uncapped logical partitions with the following weightings:

Assuming all partitions have equal entitlement and virtual processor configurations in the partition profiles, and request additional resources from the shared processor pool over a period of 1000 cycles, how many cycles will be allocated to LPAR B?

Correct Answer: B Vote an answer
An administrator is designing a new system for a currently existing OLTP (Online Transaction Processing) application. It is heavily batch oriented and relies heavily on secondary storage.
Which storage method should be implemented in order to achieve the highest possible throughput?

Correct Answer: C Vote an answer
A VIO server administrator is configuring MPIO-based storage for a new LPAR named P7_3_AIX.The administrator runs the lspv -free command and sees 4 disks free. The lsmap -all command confirms that the disks are free. A check of the list of LPARs shows the following: In order to avoid problems, what else should be verified before mapping storage to the new LPAR?

Correct Answer: A Vote an answer
While reactivating client LPARs following a scheduled power down, some LPARs have lost visibility to their NPIV-allocated SAN LUNs. On investigation it appears the WWNs have changed on the problem LPARs. What is the most likely cause for the change in WWN?

Correct Answer: D Vote an answer
What is the maximum number of clients which can be configured to use a single port on a Host Ethernet Adapter?

Correct Answer: D Vote an answer
When planning for virtual disk redundancy on an AIX LPAR, which solution would provide the highest availability?

Correct Answer: C Vote an answer
A Power Systems server is configured with a VIO server and several client LPARs. The administrator wants to use the padmin user to create a script, which will run on the VIO server to back it up to a remote system. Script output must be collected. How can this be achieved?

Correct Answer: C Vote an answer
When many LPARs require large quantities of SAN LUNs, what is a benefit of leveraging NPIV over more traditional vSCSI virtualization?

Correct Answer: C Vote an answer

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어