SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5 - C-TSCM42-65 Exam Practice Test
Your customer tests the firming options for planned orders in SAP ECC using a test material. Therefore, the customer sets a firming date in the stock/requirements list manually. Additionally, the customer sets a planning time fence with firming type 1 in the material master.
How is the resulting firming interval specified in this scenario?
How is the resulting firming interval specified in this scenario?
Correct Answer: A
Vote an answer
Which types of objects can be changed with Engineering Change Management (ECM)? (Choose three)
Correct Answer: A,B,C
Vote an answer
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon should be set equally for all materials by default. However, some materials need to have a different planning horizon.
What procedure do you recommend for setting the planning horizon?
What procedure do you recommend for setting the planning horizon?
Correct Answer: C
Vote an answer
Which activities lead to a reduction of the capacity requirements for an operation? (Choose three)
Correct Answer: A,C,E
Vote an answer
You maintained the planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months you have planned requirements with requirement type LSF (derived from the main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following statements are applicable in this case? (Choose two)
Which of the following statements are applicable in this case? (Choose two)
Correct Answer: A,C
Vote an answer
What option for selecting a routing exists when creating a production order?
Correct Answer: C
Vote an answer
You use a planning time fence and fixing type 1. You receive a customer order with a material availability date within the planning time fence.
What do you have to consider in this scenario?
What do you have to consider in this scenario?
Correct Answer: C
Vote an answer
Which of the following elements can be used in a process order? (Choose three)
Correct Answer: C,D,E