IBM Power Systems Scale-Up Technical Sales - C1000-031 Exam Practice Test
What is the advantage of NVMe U.2 flash drives on a Power System E980 SAP HANA BW implementation?
Correct Answer: A
Vote an answer
A customer with an AIX in-house SMT2 application on POWER6 would like to upgrade to POWER9. The customer would like to know the relative performance of the servers.
Which resource provides the SMT2 performance of the two systems?
Which resource provides the SMT2 performance of the two systems?
Correct Answer: A
Vote an answer
A customer wants to provision all storage for a particular workload, which will run on 12 individual LPARs in a Power System E980. Their Chief Information Officer is concerned that allocating all the storage to each LPAR individually will lead to lack of storage flexibility in the long term.
How can shared storage pools benefit this customer?
How can shared storage pools benefit this customer?
Correct Answer: A
Vote an answer
A customer has four AIX VMs, each running a different application that needs simultaneous read/write access to the same files.
Which of the following products should be recommended?
Which of the following products should be recommended?
Correct Answer: C
Vote an answer
A customer is comparing a Power Systems solution with an x86 solution for big data analytics.
Which no-charge IBM analysis is available to justify the value of IBM Power Servers compared to x86 solutions?
Which no-charge IBM analysis is available to justify the value of IBM Power Servers compared to x86 solutions?
Correct Answer: A
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
A customer is evaluating options for a new system to handle a rapidly growing workload. Initial requirements are for 16 cores and 1TB, and growth expected to be 15% per year.
Why should Enterprise Power Systems be marketed over Scale-out systems to this customer?
Why should Enterprise Power Systems be marketed over Scale-out systems to this customer?
Correct Answer: A
Vote an answer
Which HMC alternative will support a migration from a Power System E880 to a Power System E980?
Correct Answer: D
Vote an answer
How is rack space reserved for cabling space when configuring Power System E980 servers?
Correct Answer: A
Vote an answer
A customer would like to have the ability to dynamically adjust processor and memory allocations for a virtual machine. They are currently running VMware and Linux on x86.
What is a benefit of using PowerVM over VMware on x86?
What is a benefit of using PowerVM over VMware on x86?
Correct Answer: B
Vote an answer
A customer wants to use Live Partition Mobility (LPM) to migrate an AIX 7.1 LPAR from their Power System E980 to some older Power servers in their existing environment.
Assuming their processor mode is set correctly, they can use LPM to move from POWER9 to:
Assuming their processor mode is set correctly, they can use LPM to move from POWER9 to:
Correct Answer: A
Vote an answer