An integration developer wants to ensure that the application is backwards compatible with a previous version of IBM Integration Designer, and decides to remove the most recent fix pack. What action should the integration developer take in order to accomplish this task? The integration developer should open the IBM Installation Manager and select:

Correct Answer: A Vote an answer
An integration developer exported the MyModule.zip file in a Project Interchange format from IID. The integration developer is ready to deploy the application on the IBM Process Server using command serviceDeploy C:\MyModule.zip What behavior can the integration developer expect from running the command?

Correct Answer: A Vote an answer
In the business process below, the "Invoke Credit Checking Service" invokes a service that provides a credit rating for a loan application. An integration developer has received a requirement that loan applications received between 1.Jun.2013 to 31.Dec.2013 must use a different service for obtaining the credit rating.

How does the integration developer deliver a solution that will allow for dispatching the service calls to different services based on the above date criteria while ensuring that any further changes to the dispatching service will take place dynamically without requiring the module to be redeployed?

Correct Answer: B Vote an answer
Which statement correctly describes SCA?

Correct Answer: D Vote an answer
An integration developer has configured a BPEL business process for a customer, as shown below:

Assume that the transaction behavior of both snippets is Commit After. What behavior will the integration developer observe when executing the flow? Snippet1 and Snippet2 will run in:

Correct Answer: B Vote an answer
An application receives a batch of order records that are needed to populate a database. An order record is received that will cause an insert into the database table. Subsequent records will update this record. It is important that the: ?insert record is processed first. ?updates are processed so that the order record has the correct information at the end of processing. ?If update 1 changes the quantity from 5 to 20. ?If update 2 changes the quantity from 20 to 11. ?If update 2 is processed before update 1, the order quantity will no longer be correct. Which of the following quality of service (QoS) qualifiers should the integration developer use?

Correct Answer: C Vote an answer

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어