IBM PureFlex Technical Support V1 - C4120-781 Exam Practice Test
Which of the following HP product offerings compete head-to-head with PureApplication Systems?
Correct Answer: A
Vote an answer
An initial design created a PureFlex system with four p260 compute nodes for a customer with existing Power Systems that are virtualized with dual VIO servers. The customer states that dual VIO servers are required for all Power Systems. What should be done to ensure the compute nodes have dual VIO servers?
Correct Answer: B
Vote an answer
A customer has existing mixed x86 and Power blades deployments on traditional IBM BladeCenter hardware. In what area does an IBM Flex System provide significant improvement over the customer's existing infrastructure?
Correct Answer: B
Vote an answer
A customer has a legacy x86 deployment on physical servers. What benefit do server hypervisors such as VMware offer to preserve legacy workloads?
Correct Answer: B
Vote an answer
A customer wants Image Management as part of the PureFlex offering but does not require redundancy.
Which of the following is the minimum edition to meet these requirements without adding features?
Which of the following is the minimum edition to meet these requirements without adding features?
Correct Answer: B
Vote an answer
A customer is interested in virtualizing their lightly used Power servers onto a PureFlex node. There are four active CPUs on their PureFlex POWER7 node, Which of the following is the maximum number of LPARs that can be started when they virtualize with PowerVM?
Correct Answer: B
Vote an answer
A customer is discussing PSU redundancy alternatives. Which is an advantage of N+1 over N+N for PSU redundancy?
Correct Answer: B
Vote an answer