IBM PureFlex Technical Expert V1 - C4120-784 Exam Practice Test
The technical expert is proposing a PureFlex solution in a client location that is mainly Cisco branded. The CIO favors a highly integrated solution, consisting of compute nodes, network and SAN infrastructure, storage and management. When compared to Cisco UCS, what makes a PureFlex the best solution for this client?
Correct Answer: C
Vote an answer
A client wants to see how the 900 GB 10k drives would be used in a RAID 5 set to migrate their 30 TB of storage. Which tool can the technical expert use to show the layout for Flex System V7000 Storage Node?
Correct Answer: C
Vote an answer
In some sales situations, involving the client LAN networking team in the PureFlex discussion can potentially result in a competitive Cisco UCS bid. Consequently, the sales team may choose to engage with the client networking team as late as is reasonably possible in the sales process. At the very least, what networking information must be determined before an accurate order can be placed?
Correct Answer: B
Vote an answer
A client requires the following functions as part of their management of the PureFlex environment: Single sign-on (centralized user management) Secure boot: TPM and CRTM Intel TXT technology (Intel Xeon-based compute nodes) Signed firmware updates to ensure authenticity Secure communications Certificate authority and management Chassis and compute node detection Role-based access control Security policy management Which PureFlex management function is required to execute these tasks?
Correct Answer: D
Vote an answer
A client has expressed a desire to utilize an existing current model HMC to manage Power compute nodes in a Flex Chassis which also contains x86 compute nodes and an IBM Flex System V7000 Storage Node. The client also stated the ability to have SAN zones automatically built when creating storage volumes is more important in this environment. How should a technical expert respond to these statements?
Correct Answer: D
Vote an answer
A cost conscious client wants to purchase a two POWER node PureFlex solution. Each node will have 16 cores, two AIX LPARs, and they need four ports of FCoE communications. A critical requirement is there can be no single point of failure. Which solution will meet all the client's requirements?
Correct Answer: B
Vote an answer
The client has three independent redundant SAN fabrics: One for development, one for validation and one for production. The client will use a chassis with x240 nodes to connect these SAN fabrics. What is the best solution for the client?
Correct Answer: C
Vote an answer