ISQI ISTQB Certified Tester Advanced Level - Test Analyst (Syllabus 2012) - CTAL-TA_Syll2012 Exam Practice Test
Your test team is currently executing interoperability testing. Consider the following excerpt from the failure description of an interoperability defect report:
1.Connect external camera to a Windows Vista PC.
2.Start the camera application on the PC. Application starts normally and recognizes connected camera.
3.Attempt to download the recorded data from the camera.
4.Data does not download.
5.Attempt to download the data three times. Data will not down-load.
Based on this information alone, which of the problems described hereafter exists in this defect report?
[K4] 3 credits
1.Connect external camera to a Windows Vista PC.
2.Start the camera application on the PC. Application starts normally and recognizes connected camera.
3.Attempt to download the recorded data from the camera.
4.Data does not download.
5.Attempt to download the data three times. Data will not down-load.
Based on this information alone, which of the problems described hereafter exists in this defect report?
[K4] 3 credits
Correct Answer: D
Vote an answer
Apart from state transition testing, which other specification-based technique would you additionally choose to test the interfaces between components of "Route Calculation" and thus typically find different types of defects?

Identify the MOST likely technique from the following list.
[K4] 3 credits

Identify the MOST likely technique from the following list.
[K4] 3 credits
Correct Answer: B
Vote an answer
Which of the following criteria on test progress would enable the business to determine a likely 'go live' date?
(i)Number of tests planned versus number of tests executed
(ii)Number of high priority defects outstanding
(iii) The test team's timesheets in order to show how much effort has been devoted to testing
(iv)Number of tests passed and number failed
(v)Number of defects found in each development area
(vi)The rate at which defects are being found
[K2] 1 credit
(i)Number of tests planned versus number of tests executed
(ii)Number of high priority defects outstanding
(iii) The test team's timesheets in order to show how much effort has been devoted to testing
(iv)Number of tests passed and number failed
(v)Number of defects found in each development area
(vi)The rate at which defects are being found
[K2] 1 credit
Correct Answer: D
Vote an answer
A new banking system has 2 customers' types, 2 account types and will operate in two different countries?
How many test cases will be needed using the pair wise testing technique and the appropriate 2wise orthogonal array?
[K3] 3 credits
How many test cases will be needed using the pair wise testing technique and the appropriate 2wise orthogonal array?
[K3] 3 credits
Correct Answer: C
Vote an answer
During the test execution defects are found on non-compliancy to requirements, calculations that produce incorrect results, and improper handling of data or situations.
Which of the following test types is most likely being performed?
[K2] 1 credit
Which of the following test types is most likely being performed?
[K2] 1 credit
Correct Answer: B
Vote an answer
Study the "Supercar" classification tree, which of the following statements is correct?

[K3] 2 credits

[K3] 2 credits
Correct Answer: B
Vote an answer