You are your employer's most experienced TA. The organisation performs root cause analysis (RCA) thoroughly, but infrequently and only on individual defects that went live at the highest of the five Severity levels.
After six months of live operation for one system, particular concern has been expressed about the volume of usability and security defects and there is a strong desire to reduce their quantities. You have recommended adding product quality characteristics, per ISO 25010, to the defect report template.
How might this recommendation support RCA?

Correct Answer: D Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
You are working on a project to replace an old sales and merchandising system with a new system that will be based on modern platforms. The old system Is still in production but is poorly documented and expensive to maintain. The new version will be developed using modern technology. The main requirements for the system are that it shall:
* Load sales data, sent electronically from the stores each evening, into a central database.
* Produce actual sales reports for the merchandisers, whose job is to manage stock levels in stores.
* Produce sales forecast reports based on a combination of sales history and forecasting parameters. The parameters will be entered by the merchandisers into a browser-based front end and the reports will be produced overnight. The users will be able to see the reports next day, on screen or in print, by requesting this through the browser.
Requirements 1 and 2 are satisfied by the existing system and will be rewritten with no significant changes.
Requirement 3 is new. The development will use your company's Agile SDLC, with 2-week iterations.
Technical skill levels in the team are high and the approach to automate test execution is aggressive. Each requirement will be specified with user stories, will be released only when complete, and will need more than one iteration. The main business benefit will come from requirement 3, which depends on the other two requirements, and the stakeholders are keen to get this into production as soon as possible.
Release planning has begun for requirement 3 and you need to know at a high level what the testing scope will be, to ensure that the correct resources will be available. Which functional test techniques will be MOST effective for this release?
a) Domain testing
b) Combinatorial testing
c) Random testing
d) CRUD testing
e) Scenario-based testing
f) Decision table testing
g) Exploratory testing

Correct Answer: D Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
A system will be developed to support the administration of table-tennis tournaments. The following requirements for the enrolment of entrants have been provided:
R1. High. The administrator shall be able to enter the entrant's name, address, phone number/s (mobile and/or home), email and social media handles. Validation rules for these data items are provided separately.
R2. High. The administrator shall be able to enter the entrant's current world ranking (up to 250) and their relationship with the tournament sponsors (i.e. clothing / equipment / endorsement).
R3. High. The administrator shall be able to enter the entrant's attendance history at previous events (i.e.
finalist / played / withdrew during event / withdrew before event).
R4. Medium. From the entrant's address the system shall derive whether or not the entrant lives locally and, on the basis of that combined with other rules that are provided separately, shall suggest how much of the tournament's overall prize fund should be offered to the entrant as their individual attendance fee.
R5. Low. The administrator should be able to change the suggested attendance fee and the system should then deduct this from the remaining prize fund balance accordingly.
You have been asked to review the requirements using perspective-based reading, from your viewpoint as the TA who will be writing functional correctness system test cases. Assume that the other rules referred to by requirements R1 and R4 have been reviewed and are satisfactorily testable. Which conclusion would you reach?

Correct Answer: B Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
You have been assigned as Test Analyst on a project that will deliver quotes for motor insurance. The amount quoted depends upon the combined values of twelve variables, that are resolved by a set of business rules.
What should be your MAIN task during the test analysis activity?

Correct Answer: C Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
You are a TA in the development of a road traffic control application, which will be installed at busy road junctions, to control the operation of traffic signal lights according to sensors that detect traffic volume. This safety-critical project is still in the early stages of test planning and the project schedule is tight.
The Test Manager has asked you if crowd testing should be included in the project's test strategy. You do NOT think it should. Which limitation of crowd testing MOST influences your view?

Correct Answer: B Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어