BICSI Data Center Design Consultant - DCDC - DCDC-003.1 Exam Practice Test

what room should the battery room be adjacent to?

Correct Answer: B Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
What 3 standards books should be followed for data center grounding and bonding?

Correct Answer: B Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
Where should the entrance room be located within a data center?

Correct Answer: A Vote an answer
when is a battery room required to have electrolyte spill containment and exhaust systems?

Correct Answer: C Vote an answer
what is the recommended height, of the support room pathway

Correct Answer: B Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
where should printers be located

Correct Answer: D Vote an answer
What is the highest allowable elevation for a data center site?

Correct Answer: C Vote an answer
What is minimum recommended generator fuel storage amount?

Correct Answer: D Vote an answer
What are the equipment clearance/access requirements when designing the door openings and loading dock areas for a data center?
Correct Answer:
Clearance requirements of 10' L x 4' W x 8' H and 7500 pounds
What is the minimum separation distance for redundant utility service feeds

Correct Answer: A Vote an answer
What is the recommended range for the low temperature in a data center according to ASHRAE?

Correct Answer: C Vote an answer
What is the recommended clearance space required for hot and cold aisles in a data center?

Correct Answer: A Vote an answer
What is the appropriate fire rating requirements for an ITE space?

Correct Answer: B Vote an answer

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어