EMC Specialist - Implementation Engineer, PowerEdge - DES-4122 Exam Practice Test
An engineer needs to upgrade a Dell EMC PowerEdge R440 server from a single PSU to dual PSU configuration. There are unused PSU modules from PowerEdge R430 and R420 servers available, and they have the same wattage ratings.
What should the engineer do to complete the task?
What should the engineer do to complete the task?
Correct Answer: D
Vote an answer
What is the Open Compute Project (OCP) card used for in a Dell EMC PowerEdge server?
Correct Answer: C
Vote an answer
How can a technician know whether IDRAC9 System Lockdown mode is enabled?
Correct Answer: D
Vote an answer
An engineer needs to install an additional PSU on an existing, single PSU Dell EMC PowerEdge R740. They complete the initial installation and cabling procedures. They connect an AC cable and the power distribution unit produces normal AC output. The engineer checks power management and sees that the new PSU is in the Failed state.
What task should be completed to troubleshoot this issue?
What task should be completed to troubleshoot this issue?
Correct Answer: D
Vote an answer
An engineer is checking a newly delivered Dell EMC PowerEdge R640 server that will be deployed for a new database environment The inventory consists of:

The server power configuration will be set for gnd redundancy The management switch is 1000 Base-T and the top of rack switches 10Gb What additional component(s) is needed for this configuration?

The server power configuration will be set for gnd redundancy The management switch is 1000 Base-T and the top of rack switches 10Gb What additional component(s) is needed for this configuration?
Correct Answer: C
Vote an answer
What is required to use the iSM Automatic System Recovery feature?
Correct Answer: B
Vote an answer
Starting from which Dell EMC PowerEdge server hardware generation is the Micro SD card in the IDSDM/vFlash module supported?
Correct Answer: A
Vote an answer