Hitachi HDS Certified Implmenter-Enterprise - HH0-210 Exam Practice Test
A customer wants to de-install a USP which is currently virtualized behind a VSP. They have stopped the Host I/O to the affected LUNs and have unmounted them. What is the next sequence?
Correct Answer: A
Vote an answer
A customer wants to add a second DKC to a VSP. Which three hardware features must be installed in the second DKC? (Choose three.)
Correct Answer: C,D,E
Vote an answer
What are two requirements for connecting a USP VM as external storage to a VSP? (Choose two.)
Correct Answer: A,B
Vote an answer
A customer is using an AMS 2300 system as external storage behind a VSP. They are reworking the power distribution and need to power down both storage systems. What is the correct sequence of actions?
Correct Answer: B
Vote an answer
A customer is planning to deploy the Hitachi Command Suite (HCS) in an existing production environment that includes several VSP systems. What are two advantages of Hitachi Device Manager over Storage Navigator? (Choose two.)
Correct Answer: C,D
Vote an answer
Which two actions must be performed when planning an online microcode exchange on a VSP? (Choose two.)
Correct Answer: A,C
Vote an answer