HP Designing HP SAN Networking Solutions - HP0-J65 Exam Practice Test
A customer has bought another company and wants to merge both SANs. Both SANs are B-Series based and were modernized a year ago. You are asked to plan the new consolidated SAN and to propose a migration strategy.
In this scenario, what else should you recommend to the customer in advance of the merger?
In this scenario, what else should you recommend to the customer in advance of the merger?
Correct Answer: D
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
Scenario:
A company has been using a Fibre Channel infrastructure for the last three years. The company is located in a nine-story building but is currently occupying eight floors. Each of the nine floors has its own Brocade 8 Gb SAN Switch with Fibre Channel, which has a license for eight ports. Each department hosts a single Windows 2008 terminal server host for connection to their storage and data applications on the SAN, which is in the data center on the first floor. Each Brocade 8/8 switch is connected to the floor above and below by a single fibre connection.
Refer to the Scenario:
As utilization of the terminal servers increases, the company notices more I/O timeouts from the servers on the second through eight floors. Without upgrading the current company infrastructure.
Which change should you make to their configuration to resolve this issue?
A company has been using a Fibre Channel infrastructure for the last three years. The company is located in a nine-story building but is currently occupying eight floors. Each of the nine floors has its own Brocade 8 Gb SAN Switch with Fibre Channel, which has a license for eight ports. Each department hosts a single Windows 2008 terminal server host for connection to their storage and data applications on the SAN, which is in the data center on the first floor. Each Brocade 8/8 switch is connected to the floor above and below by a single fibre connection.
Refer to the Scenario:
As utilization of the terminal servers increases, the company notices more I/O timeouts from the servers on the second through eight floors. Without upgrading the current company infrastructure.
Which change should you make to their configuration to resolve this issue?
Correct Answer: C
Vote an answer
What does an HP Enterprise Backup Solution (EBS) environment provide? (Select two.)
Correct Answer: B,C
Vote an answer
What does Remote Support Pack (RSP) provides?
Correct Answer: C
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
You are designing the initial phase of a large core-edge SAN implementation. Which design consideration should you incorporate?
Correct Answer: C
Vote an answer
A customer needs a C-series switch with a two slot configuration.
Which switch series fits this need?
Which switch series fits this need?
Correct Answer: A
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
Which component adds an intelligent layer between tape devices in HP StorageWorks Enterprise Tape Libraries and Fibre Channel fabric?
Correct Answer: B
Vote an answer
Which zoning best practice should you follow when storage, servers, and tape libraries are in the same fabric?
Correct Answer: D
Vote an answer
During a recent customer presentation, a question was raised regarding the HP StoreVirtual cluster running out of storage space. In reviewing the customer needs. The recommendation was to add a new HP StoreVirtual cluster. How can the customer move data from the existing HP P4000 cluster to the new HP StoreVirtual cluster?
Correct Answer: C
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
A customer wants to migrate their servers from a network-based solution to a SAN-based solution. During your investigation of needed switch ports you discover the customer has approximately 400 servers and expects to grow to 1000 servers within the next five years. In the proposal, the customer wants redundant connections for each server to the SAN.
Which switch series should you consider in your proposal?
Which switch series should you consider in your proposal?
Correct Answer: C
Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
What should be done in preparing the SAN for production to help minimize risk and maximize the probability of success?
Correct Answer: D
Vote an answer
Your customer is concerned about business continuity. Which SAN design elements should you highlight to demonstrate that the concern has been addressed? (Select two.)
Correct Answer: A,C
Vote an answer