HP Aruba Certified Design Expert Written - HPE6-A80 Exam Practice Test

A customer has an Aruba wireless network. which includes two MC 7205s and an MM at the network core. The company now wants to accommodate 50 mobile trainers These trainers travel around the world and run training events. The trainers often need to access materials in the company data center, but cannot reach materials when they are on the road.
The company wants to give the mobile workforce a secure way to reach the materials they need no matter where they are.
including in public spaces like the hotels where they often leach. The customer also requires that the solution be as cost effective as possible while meeting the requirements.
Which plan meets the needs of the mobile Trainers?

Correct Answer: B Vote an answer
A customer has a large network, which includes a main site and many branch sites. The network has a total of about 10.000 wireless devices at the main site and 15,000 wireless devices total at branches.
To fulfill the requirements for a wireless network upgrade, the architect plans to propose;
* 2 7205 MCs at the main site
* 2 7210 MCs at the main site
* 10 7030 MCs at branch sites
* 200 RAPs at branch sites
* 500 CAPS at the main site
* 300 CAPS at branch sites
What is the most cost-effective Mobility Master solution that meets the requirements'?

Correct Answer: B Vote an answer
Refer to the exhibit.

The exhibit shows the current AP deployment In a warehouse that stores frozen food goods:
* APs are mounted on the ceiling, which is 15 feet (4.6 m) high.
* Shelves are 12 feet (3.7 m) high and are typically fully stocked.
This customer indicates that their current wireless performance is inadequate.
What should the network architect include in the new solution to resolve this issue?

Correct Answer: A Vote an answer
What is one customer requirement that can drive the need for a relatively dense AP deployment. In which ire coverage areas of at least three AP radios overlap?

Correct Answer: D Vote an answer
Refer to exhibit.

A customer has a building that needs a switch upgrade. The customer would like at least 20Gbps for the uplink bandwidth out of each closet. The building wiring plan is shown in Exhibit i. The customer will not consider any cabling upgrades at this point. The current proposal is shown in Exhibit 2.
Which correction must the architect make to the proposal to meet the customer requirements?

Correct Answer: D Vote an answer
A mall requires a wireless network upgrade to 802 -Max The company that owns the mall wants to provide the APs for the entire mall. However, several of the larger national chain retailers with spaces in the mall want to offer wireless services with their own SSIDs.
These individual retailers also have their own wireless guest services and wireless client devices They have their own corporate infrastructure and want to handle all of this wireless traffic on their own, including terminating the traffic on their own controllers. The mall requires redundancy for its services, out the retailers do not.
Which plan for mobility controllers (MCs) and mobility master (MW) meets the needs of this scenario?

Correct Answer: A Vote an answer
Refer to the exhibit.

A hotel needs a wireless solution, i he hotel has 802.3af switches.
The architect has selected the 505H Series, controlled by a local MC as the best choice The 5QoH series will need to power a connected phor which have only a single Ethernet port. The architect has created the BOM shown in the exhibit. (Note that this portion of the BOM does not inc Which correction should the architect make?

Correct Answer: A Vote an answer

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어