Authentic SAP C_TS422_2504 Exam Dumps PDF - 2025 Updated
Get Prepared for Your C_TS422_2504 Exam With Actual 82 Questions
NEW QUESTION # 35
Which of the following elements does MRP take into account during net requirement calculation?
Note: There are 2 correct answers to this question.
- A. ATP quantities
- B. Production orders
- C. Planned orders (unfirmed)
- D. Planned orders (firmed)
Answer: B,D
NEW QUESTION # 36
What does forecasting in the demand planning cycle include?
Note: There are 3 correct answers to this question.
- A. Market intelligence
- B. Past production planning quantities
- C. Past sales order quantities
- D. One-off events
- E. Past quotation quantities
Answer: A,C,D
NEW QUESTION # 37
What are some options for creating production orders without using trigger points?
Note: There are 2 correct answers to this question.
- A. In assembly production, a sales order triggers the creation of a production order
- B. In make-to-stock production, you can manually create production orders
- C. In assembly production, confirmation of scrap triggers the creation of a production order
- D. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order
Answer: A,B
NEW QUESTION # 38
How are dependent requirements for assemblies created?
Note: There are 2 correct answers to this question.
- A. They are only created for multilevel bill of material (BOM) structures.
- B. They are created together with the independent requirement for the finished product.
- C. They are created with exact times in Advanced Planning.
- D. They are created on the assembly level during the planning run.
Answer: C,D
NEW QUESTION # 39
Which order type is used for repetitive manufacturing?
- A. Production order
- B. Process order
- C. Planned order
- D. Kanban order
Answer: C
NEW QUESTION # 40
What is the purpose of the pull list in material staging?
- A. To control the flow of material from the central storage location to the production storage location
- B. To control the flow of material from the production storage location to the central storage location
- C. To control the flow of material from the supplier to the central storage location
- D. To control the flow of material from the supplier to the production storage location
Answer: A
NEW QUESTION # 41
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Select a special procurement type inside the material master
- B. Select a special explosion type inside the material master
- C. Select a special explosion type inside the material BOM (bill of material)
- D. Select a special procurement type inside the material BOM (bill of material)
Answer: A,D
NEW QUESTION # 42
Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?
- A. When several operations are maintained for one product
- B. When multiple planned orders are scheduled in parallel on one resource
- C. When several production versions are maintained for one product
- D. When alternative resources are used within one operation
Answer: D
NEW QUESTION # 43
What are some SAP recommended guiding principles to achieve clean core operations?
Note: There are 3 correct answers to this question.
- A. Establish an organizational structure, technical foundation, and transformation methodology for clean core.
- B. Define roles and responsibilities as part of a process transformation office.
- C. Establish regular housekeeping tasks and procedures.
- D. Establish release management.
- E. Integrate clean core practices in the end-to-end value process chain.
Answer: A,B,D
NEW QUESTION # 44
What are some advantages of using Kanban for material supply? Note: There are 2 correct answers to this question.
- A. Material is only kept available in small quantities in production.
- B. Replenishment is only triggered when components are required.
- C. Material stock is built up for a long period of time in production.
- D. Replenishment is always triggered on a regular basis.
Answer: A,B
NEW QUESTION # 45
When working with the material status, for which business areas can you set a warning message?
Note: There are 2 correct answers to this question.
- A. Classification
- B. Sales
- C. Plant Maintenance
- D. Purchasing
Answer: B,C
NEW QUESTION # 46
Which chart types does the tabular planning table for capacity planning provide in SAP S/4HANA Cloud Private Edition?
Note: There are 2 correct answers to this question.
- A. Work center capacities chart
- B. Order (dispatched) chart
- C. Capacity requirements chart
- D. Order (pool) chart
Answer: A,C
NEW QUESTION # 47
Advanced Planning uses data from SAP S/4HANA Cloud Private Edition. In which master data objects can you set the Advanced Planning flag?
Note: There are 2 correct answers to this question.
- A. Plant
- B. Production version
- C. Material
- D. Work center
Answer: C,D
NEW QUESTION # 48
Which operations are considered in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Only bottleneck operations
- B. Operations assigned to a pacemaker work center
- C. All operations
- D. Sub-operations
Answer: A,D
NEW QUESTION # 49
Why would you use phantom assemblies?
Note: There are 2 correct answers to this question.
- A. To make the assignment of components easier
- B. To reduce the number of material masters
- C. To enable simple structuring of BOMs
- D. To make the procurement easier
Answer: A,C
NEW QUESTION # 50
Which objects can you change with a change number?
Note: There are 2 correct answers to this question.
- A. Work center
- B. Production order
- C. Routings
- D. Bill of material
Answer: C,D
NEW QUESTION # 51
What are the selection criteria of a bill of material (BOM) alternative?
Note: There are 2 correct answers to this question.
- A. Material BOM usage
- B. Date
- C. Lot size
- D. Change number
Answer: B,C
NEW QUESTION # 52
What data can you maintain in the items detail screen of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Co-product
- B. Lot size
- C. Alternative item group
- D. Change number
Answer: A,C
NEW QUESTION # 53
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.
- A. It can be accessed by using SAP For Me.
- B. It can be used in all SAP S/4HANA Cloud editions.
- C. Customers can grant access to the dashboard to partners.
- D. Customers can use the dashboard in the dev, test, and production tenants.
Answer: A,C
NEW QUESTION # 54
You use the Finite Scheduling - with Reverse planning strategy and want to allow scheduling in the past.
How can you parameterize this in the strategy profile?
- A. Specify a negative PP/DS horizon
- B. Specify a negative planning horizon
- C. Specify a negative offset time
- D. Specify a negative opening period
Answer: C
NEW QUESTION # 55
......