NCARB ARE 5.0 Project Development and Documentation - PDD Exam Practice Test


Refer to the exhibit.
The construction method shown in the detail should be used to prevent cracking in which of the following situations?

Correct Answer: A Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
Before construction documents are complete, the owner requests a review of the timeline allowed for ASIs, RFIs, RFPs, and change orders as defined in the project manual.
Which section of the project manual is relevant to this request?

Correct Answer: B Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).

Refer to the exhibit.
Which device allows for piping misalignment and isolation?

Correct Answer: C Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
What is the most destructive factor affecting the durability of mortar joints?

Correct Answer: C Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
A family-owned apple farm in the Upper Midwest is taking advantage of a change in the local zoning code that added a new Agri-Tourism class in the existing farm zone. This allows the Owner to build a new facility on their existing site. The building will be open to the public and include a brewery, distillery, tap room, and market. The architect is ready to submit the drawings to the Owner for the 50% construction documents review.
To accommodate a compressed construction schedule, the Owner will be utilizing a design-build process. The Contractor has submitted the Pre-Engineered Metal Building (PEMB) shop drawings to the Architect for review, due to the lead time on this critical path item. Once construction begins, farming operations must be able to continue uninterrupted.
Key project information includes:
* Brewing and distilling will operate year-round.
* Brewery will initially include four fermenting tanks. Owner has requested space for at least two additional tanks. Potential expansion will be based on future sales.
* Distillery will produce 16% alcohol, which is classified as a flammable liquid. Fire separations are required.
* Tap Room is designed with seating for 300 people, not including exterior patio seating. It will have views to the working orchards and the historic buildings on site.
* Tap Room is scheduled to be open from August through November. Owner would like options to extend operating dates based on popularity.
* The Market area will feature local farm products and is not conditioned.
* Entire building will be fully sprinklered.
* Selected building materials are low-maintenance, as requested by the Owner, for durability and to reflect the nature of a working farm.
* Mechanical and electrical systems will be hung from the building structure. These loads are included in PEMB shop drawings.
* Public water and sewer is not available at the Project Site.
* Occupancy sensors are included to reduce utility costs and achieve energy conservation requirements.
The following resources are available for your reference:
* Architectural Drawings, including plans, elevations, sections, and schedules
* Consultant Drawings, including structural, HVAC, power distribution, and plumbing
* PEMB Shop Drawings
* Design and Construction Schedule
* Specification Excerpts, showing relevant spec sections
* IBC and ADA Excerpts, showing relevant code and accessibility sections
* After reviewing the documents, the architect discovers a coordination issue in the corridor.

The owner is concerned about elevated noise levels in the Tap Room when fully occupied. The current design utilizes a 2 x 2 acoustic ceiling tile system installed above the fans. An acoustical engineer recommends noise mitigation through limiting reverberation time (RT) to 2.0 seconds or less in the space. This can be achieved by the provided ceiling material options and their corresponding area.
What should the architect recommend that will minimize additional project costs while providing the recommended acoustical solution?

Correct Answer: C Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).

Refer to the exhibit.
In the curtain wall systems shown, each of the aluminum mullions is designed to allow for which of the following?

Correct Answer: D Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
Temporary shoring of a masonry wall should remain in place until what point?

Correct Answer: D Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
The architect has completed 60% of the construction documents. The owner wants to establish the guaranteed maximum price (GMP) at this point before 100% of the construction documents are complete. Several flooring finish items are still undetermined.
What should be included in the project manual to make sure the contractor has a cost to cover all finishes?

Correct Answer: B Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).
The walls of typical light wood-frame buildings can most economically be made resistive to lateral shear forces, without major alteration to the existing structure, through the use of which one of the following?

Correct Answer: D Vote an answer
Explanation: Only visible for Fast2test members. You can sign-up / login (it's free).

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어