NEW QUESTION 20
Identify three requirements fulfilled by nonstandard work orders.
- A. Repair
- B. Rescheduling
- C. Rework
- D. Prototype
Answer: A,C,D
NEW QUESTION 21
During a Manufacturing Cloud implementation, the Production Supervisor wants to close the work orders for last month and wants to make sure that the work orders include the correct cost.
Identify the approach to be taken by the Production Supervisor.
- A. The Production Supervisor should make sure that all costs are included while closing last month's work orders; however, variances can be included after closing the work orders.
- B. The Production Supervisor needs to include all costs and variances in last month's work orders and close them; however, the work orders where updates are expected, should not be closed.
- C. Work order costs can be updated anytime regardless of the status of the work order.
- D. The Production Supervisor need not include cost variances while costing last month's work orders because those can be applied directly in subledger accounting.
Answer: B
NEW QUESTION 22
In a manufacturing plant, the work definition and rate plans of Material, Resource, and Overhead of an assembly have been defined as required.
A cost accountant created different scenarios to represent different manufacturing and cost assumptions and compare the results. When the cost assumptions are finalized, the cost accountant is expected to publish the cost scenario to cost accounting.
Identify three process steps that the cost accountant has to perform to transfer the assembly to cost accounting in frozen type.
- A. Publish cost planning scenario to Accounting.
- B. Build cost planning scenario and perform cost roll up.
- C. Transfer transactions from production to Costing.
- D. Create Accounting Distributions.
- E. Transfer Transactions from Inventory to Costing.
- F. Define a cost planning scenario with Material, Resource, Overhead cost plans, and work definition.
Answer: D,E,F
NEW QUESTION 23
Which entity should you use to configure the manufacturing plant in Functional Manager?
- A. Plant
- B. Organization
- C. Business Unit
- D. Legal Entity
Answer: A
NEW QUESTION 24
Your customer wants to mass create and modify Work Definitions and the relevant operation, items, and resources available in the spreadsheet.
Which two operations are not supported using ADFDI (Oracle Application Development Framework Desktop Integration)?
- A. Create Work Definitions
- B. Populate Descriptive flexfields
- C. Create and update ATO (Assemble To Order) model work definitions
- D. Update Work Definitions
Answer: B,C
NEW QUESTION 25
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.
- A. Oracle Business Intelligence Standard Edition
- B. Oracle Business Intelligence Application
- C. Oracle Business Intelligence Publisher
- D. Oracle Business Intelligence Enterprise Edition
Answer: C
NEW QUESTION 26
You are monitoring the production status on your shop floor. The production operator informs you that a particular resource that was not functioning for the past week is now back in operation.
Which option shows the steps to quickly release the work orders affected by this operation, which were put on hold using the mobile application?
- A. Select the infotile On Hold> Select a work order you want to release> Select the work order operation on hold > Swipe left on the work order name> Tap or click the Release action, and click OK
- B. Select the infotile On Hold> Select a work order you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
- C. Select the infertile Dispatch List> Select a work order operation you want to release> Swipe left on the work order name> Tap or click the Release action, and click OK
- D. Select the infotile Unreleased> Select a work order you want to release>Swipe left on the work order name> Tap or click the Release action, and click OK
Answer: C
NEW QUESTION 27
Work order costs are computed based on material and resource transactions reported and the cost method of the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.
- A. Transfer Transactions from Production to Costing
- B. Create accounting
- C. Transfer Transactions from Inventory to Costing
- D. Transfer Costs to Cost Management
Answer: A
NEW QUESTION 28
A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed in the previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.
- A. Report Resource, Material and Operation Transactions
- B. Review Production Transaction History
- C. Review Dispatch List
- D. Manage Work Orders
Answer: D
NEW QUESTION 29
You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Identify the setup that will fulfill this requirement.
- A. Select the Automatically Transact check box while defining the Standard Operation.
- B. Ensure that the Charge Type of the resource is Automatic.
- C. Select the Count Point check box while defining the Standard Operation.
- D. Deselect the Count Point check box while defining the Standard Operation.
Answer: C
NEW QUESTION 30
The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, has scheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?
- A. The engineer does not have Data access to Item Structures.
- B. The engineer does not have the Manage Work Definitions function privilege.
- C. The engineer does not have Data access to Items Attributes.
- D. The engineer does not have Data access to Items.
- E. The engineer does not have Data access to Manufacturing plant in which the Item Structure change was performed.
Answer: B,E
NEW QUESTION 31
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house.
- A. Resources
- B. Production Line
- C. Operation Items
- D. Manufacturing Lead Time
- E. Operations
Answer: A,C,E
NEW QUESTION 32
Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.
- A. Add an Operation
- B. Costing Priority
- C. Delete an Operation
- D. Completion Subinventory
- E. Production Priority
Answer: A,D,E
NEW QUESTION 33
A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.
- A. Reverse the product at the last operation.
- B. Reverse at an operation.
- C. Reverse material issued to a work order.
- D. Reverse from reject to ready.
- E. Reverse resources charged to a work order.
- F. Reverse from scrap to ready.
Answer: C,D,E,F
NEW QUESTION 34
A user wants to transfer the work order status updates and resource transaction data for costed resources to Cost Management.
Which scheduled process should you run to achieve this requirement?
- A. Transfer General Ledger Balances to Balance Cubes
- B. Transfer Ledger Balances
- C. Transfer Transactions to Costing
- D. Transfer Cost to Cost Management
Answer: D
NEW QUESTION 35
Identify the two configurations in Supply Chain cloud applications of Product Information Management (PIM) and Order promising (GOP), which must be set to process the Back-to-Back order with Make Supply Order, for a nonstocked item.
- A. Set the nonstocked item to be back-to-back enabled in Product Information Management (PIM).
- B. Set the global sourcing rule in GOP to determine supply creation option as Make.
- C. Create Supply Chain Orchestration Supply Execution Document Creation Rule for the nonstocked item.
- D. Set a local sourcing rule in GOP to determine supply creation option as Make.
- E. Create Supply Order Orchestration Defaulting and Enrichment Rule for the nonstocked item.
Answer: A,B
NEW QUESTION 36
You are reviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order status which is reserved against a particular customer. The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?
- A. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.
- B. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.
- C. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.
- D. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.
Answer: B
NEW QUESTION 37
A plant runs 24x7 daily using three continuous shifts of 8 hours each. One unit of an equipment resource R1 is assigned to each of the three shifts. On a specific work order, the resource R1 is required to work for 2 hours. The resource is set up with an efficiency of 50% and utilization of 100%. R1 is scheduled to start on the given work order at noon.
What time will R1 be scheduled to finish, assuming no calendar exceptions have been set?
- A. 2:00 PM
- B. 8:00 PM
- C. 4:00 PM
- D. 1:00 PM
- E. 12:30 PM
Answer: C
NEW QUESTION 38
You are setting up Fusion Manufacturing to support Back-to-Back Fulfillment.
Identify an option that needs to be set for oracle Fusion Planning Central to plan back-to-back item components and resources.
- A. Select the Used in Planning check box in the new Work Definition.
- B. Select the Used in Planning check box in the item definition.
- C. Select the Used in Planning check box in the Work Structure.
- D. Select the Used in Planning check box in the Work Definition Names.
Answer: D
NEW QUESTION 39
......