Best Quality CPIM Exam Questions APICS Test To Gain Brilliante Result! [Q348-Q371]

Share

Best Quality CPIM Exam Questions  APICS Test To Gain Brilliante Result!

Preparations of CPIM Exam 2021 APICS Certification Unlimited 590 Questions

NEW QUESTION 348
Each distribution center first determines what it needs and when, and then places orders in central supply, in:

  • A. Demand ordering system
  • B. Advancements system
  • C. Decentralized system
  • D. Competency system

Answer: C

 

NEW QUESTION 349
In order to develop possible solutions, which approach to take to help develop a better method?

  • A. All of the above
  • B. Rearrange the sequence of operations for more effective results
  • C. Simplify whenever possible by making the necessary operations less complex
  • D. Eliminate all unnecessary work

Answer: A

 

NEW QUESTION 350
Production planning problem typically has the following characteristics EXCEPT:

  • A. Plant and equipment are fixed within the time horizon
  • B. Demand is rarely fluctuating
  • C. A time horizon of 12 months is used, with periodic updating perhaps every month or quarter
  • D. Production demand consists of one or a few product families or common units

Answer: B

 

NEW QUESTION 351
A load made up of a number of items or bulky material, arranged or constrained so the mass can be picked up or moved as a single unit too large for manual handling in called:

  • A. Unit load
  • B. Package load
  • C. Pallet load
  • D. Contemporary load

Answer: A

 

NEW QUESTION 352
If the units are discrete, such as automobiles, flow manufacturing is called:

  • A. Continuous manufacturing
  • B. Repetitive manufacturing
  • C. None of the above
  • D. Fixed manufacturing

Answer: B

 

NEW QUESTION 353
A structured approach to organize the operation for more effectiveness and less waste that is the overall goal of a lean production system includes which 5S?

  • A. Sort, straighten, shine, standardize, suspect
  • B. Species, straighten, shine, standardize, sustain
  • C. Sort, strong, shower, standardize, sustain
  • D. Sort, straighten, shine, standardize, sustain

Answer: D

 

NEW QUESTION 354
The orders are automatically scheduled and controlled by the computer are the orders called:

  • A. Firms planned order
  • B. Computer generated order
  • C. Planned orders
  • D. All of the Above

Answer: C

 

NEW QUESTION 355
A routing file should contain the following information EXCEPT:

  • A. Work centers to be used
  • B. Sequence of operations
  • C. Operations to be performed
  • D. Priority plan

Answer: D

 

NEW QUESTION 356
Advantage/s of concurrent engineering is/are:

  • A. All of these
  • B. Time to market is reduced
  • C. Cost is reduced
  • D. Better quality and lower total system cost

Answer: A

 

NEW QUESTION 357
What is concerned with the transfer of ownership and its function is to negotiate, sell, and contract?

  • A. Distribution channel
  • B. Contracted channel
  • C. Transaction channel
  • D. Business channel

Answer: C

 

NEW QUESTION 358
The computer software program that organizes and maintains the bills of material structures and their linkage is called:

  • A. Bills of material processor
  • B. Procurement of material and supplies
  • C. Purchasing record
  • D. Inventory record

Answer: A

 

NEW QUESTION 359
"The function of establishing, measuring, monitoring and adjusting limits or levels of capacity in order to execute all manufacturing schedules". This definition is related to:

  • A. Capacity planning
  • B. Capacity management
  • C. None of these
  • D. Capacity control

Answer: B

 

NEW QUESTION 360
FLY Manufacturing is an aircraft manufacturer. They produce executive jets on an Engineer-to-order basis. Which of the following MRPII processes would most likely NOT be required at FLY?

  • A. materials requirements planning
  • B. Distribution Requirements Planning
  • C. Business Planning
  • D. Sales & operations Planning

Answer: B

 

NEW QUESTION 361
Exploding is the process of multiplying the requirements by:

  • A. Both A & B
  • B. By recording the appropriate requirements throughout the product tress
  • C. None of the above
  • D. The usage quantity

Answer: A

 

NEW QUESTION 362
By using following product tree, how many Ks are needed to make 200Xs and 150 Ys?

  • A. 1900 Ks
  • B. 900 Ks
  • C. 800 Ks
  • D. 2100 Ks

Answer: A

 

NEW QUESTION 363
Which of the following defines what materials have to be scheduled to make the end products?

  • A. Bills of material
  • B. All of the Above
  • C. Engineering change control bill
  • D. Master production schedule

Answer: A

 

NEW QUESTION 364
A 100% inspection means:

  • A. Testing every unit in the lot
  • B. Appropriate when the cost of inspection is less than the cost of any loss resulting from failure of the parts
  • C. None of these
  • D. Both of these

Answer: D

 

NEW QUESTION 365
If the beginning projected available balance is 100 units, the forecast is 40 units, and customer orders are 50 units, the ending projected available balance is:

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: C

 

NEW QUESTION 366
The elimination of all waste and continuous improvement of productivity is known as:

  • A. Just-in-time manufacturing
  • B. Work-in-progress manufacturing
  • C. Up-gradation manufacturing
  • D. All of the above

Answer: A

 

NEW QUESTION 367
Functional specification can be described by a combination of:

  • A. All of the above
  • B. Brand
  • C. Miscellaneous
  • D. Engineering drawings

Answer: A

 

NEW QUESTION 368
A priority plan for the components needed to make the products in the Master production schedule (MPS) is called:

  • A. Material Requirements planning (MRP)
  • B. Production Activity control (PAC)
  • C. All of the above
  • D. Capacity Requirement planning

Answer: A

 

NEW QUESTION 369
What is used to calculate how long it will take to complete a task?

  • A. Self-assured scheduling
  • B. Finite scheduling
  • C. Forward scheduling
  • D. Bold scheduling

Answer: C

 

NEW QUESTION 370
A company ships a particular product to a market located 1000 miles from the plant at a cost of $4 per mile. Normally it ships 500 units at a time. If the company can ship the units unassembled, it can ship 800 units in a truck. What is the line-haul cost per unit now?

  • A. $4
  • B. $8
  • C. $5
  • D. $10

Answer: C

 

NEW QUESTION 371
......

Focus on CPIM All-in-One Exam Guide For Quick Preparation: https://www.fast2test.com/CPIM-premium-file.html

CPIM All-in-One Exam Guide For Quick Preparation: https://drive.google.com/open?id=1R42UYPKMih8-jmvTU2GNxnsd5jUZ6LER

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어