[Dec 17, 2021] Fully Updated C_TSCM42_67 Dumps - 100% Same Q&A In Your Real Exam [Q15-Q37]

Share

[Dec 17, 2021] Fully Updated C_TSCM42_67 Dumps - 100% Same Q&A In Your Real Exam

Latest C_TSCM42_67 Exam Dumps - Valid and Updated Dumps


C_TSCM42_67 Exam Certification Details:

Languages:German, English, Japanese
Duration:180 mins
Component:Production Planning
Exam:80 questions
Sample Questions: SAP C_TSCM42_67 Exam Sample Question
Level:Associate
Cut Score:63%
Sub-solution:Product Developmement & Manufacturing

 

NEW QUESTION 15
Where can you define the valid receivers for production order costs?

  • A. In the settlement profile
  • B. In the valuation variant
  • C. In the costing variant
  • D. In the production scheduling profile

Answer: A

 

NEW QUESTION 16
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default.
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?

  • A. The planning horizon is set in the MRP groups in Customizing and variant entries are assigned via the plant parameter settings.
  • B. The planning horizon is set in the plant parameters in Customizing and variant entries are stored in the material masters for the materials in question.
  • C. The planning horizon is set in Customizing using the plant parameter setting and variant entries are assigned via the MRP groups for the materials in question.
  • D. The planning horizon is set in the MRP groups in Customizing and the variant values are stored in the material masters for the materials in question.

Answer: C

 

NEW QUESTION 17
You have maintained planning strategy group 10 (make-to-stock production) in the material master (SAP ECC) of a material. For the coming months, you have planned requirements with requirement type LSF (derived from main strategy 10). Now, you want to change the requirement type from LSF to VSF (in accordance with planning strategy 40, planning with final assembly) for requirements in the existing production plan.
Which of the following scenarios are applicable in this case? (Choose two)

  • A. You must change the requirement type for planning strategy 10 to VSF in Customizing. The requirement type for all existing requirements is then changed by the next planning run.
  • B. You can change the strategy group from 10 to 40 for the existing production plan in the material master, and the requirement type for all requirements is changed automatically.
  • C. You can enter the strategy group 40 in the material master, but the requirement type is not changed automatically for existing requirements.
  • D. You can enter the strategy group 40 in the material master and change the present requirement for the product manually in the production plan.

Answer: C,D

 

NEW QUESTION 18
What are the consequences of setting a production order to Technically Complete (TECO)? (Choose three)

  • A. Reservations are no longer relevant for material requirements planning.
  • B. Confirmations are no longer possible.
  • C. The order and its operations receive the system status Locked (LKD).
  • D. Capacity requirements are set to null.
  • E. The order is no longer relevant for material requirements planning.

Answer: A,D,E

 

NEW QUESTION 19
In which scenario will the error message shown in the attached screenshot occur?
Exhibit:

Exhibit

  • A. A valid routing exists, but the material master is set to manual routing selection.
  • B. The routing is not valid at the explosion date.
  • C. A valid routing exists, but the Customizing for the order type is set to manual routing selection.
  • D. The selection method is set to "selection only by production version" in the material master.

Answer: B

 

NEW QUESTION 20
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?

  • A. Activate the availability check and assign an overall profile in the production scheduling profile.
  • B. Set the finite scheduling indicator and assign a checking rule in the work center for the operation to be checked.
  • C. Activate the availability check and assign an overall profile in the checking control of the order type / plant combination.
  • D. Assign an appropriate availability checking rule to the material master for the product.

Answer: C

 

NEW QUESTION 21
What sequence do you follow in master data maintenance to define the production of a material?

  • A. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in BOM or routing
  • B. Create work centers -> Create routing -> Create BOM -> Carry out component assignment in work center
  • C. Create BOM -> Create work centers -> Create routing -> Carry out component assignment in work center
  • D. Create routing -> Create work centers -> Create BOM -> Carry out component assignment in BOM or routing

Answer: A

 

NEW QUESTION 22
The master data for an in-house production process is to be set up in the SAP ECC system. To do this, you should create a suitable routing that plans for five operations in an initial sequence (10, 20, 30, 40, 50). There should be an option of relocating operations 30 and 40 to a second sequence on other work centers if there are capacity bottlenecks. What sequence type would you use to create the second sequence in the system?

  • A. Standard sequence
  • B. Parallel sequence
  • C. Substitute sequence
  • D. Alternative sequence

Answer: D

 

NEW QUESTION 23
Which options can you offer someone who uses the SAP ECC system for production orders and requires support for material supply in production? (Choose three.)

  • A. Pull list
  • B. Material directory
  • C. Pick list
  • D. Automatic generation of a transport order
  • E. Logistics Information System (LIS)

Answer: A,C,D

 

NEW QUESTION 24
In which master data object do you set the standard values for an operation?

  • A. Routing
  • B. Work Center
  • C. Production Resource/Tool (PRT)
  • D. Material Master

Answer: A

 

NEW QUESTION 25
Which objects can affect the calculation of capacity requirements for an operation? (Choose three)

  • A. In-house production time (material master)
  • B. Transport time (routing)
  • C. Standard values (routing)
  • D. Formulas (work center)
  • E. Operation control key (routing)

Answer: C,D,E

 

NEW QUESTION 26
Which of the following properties about the planning functions available in SAP ECC applies?

  • A. In demand management (DM) material shortage situations are identified and corresponding receipt elements are created.
  • B. Master production scheduling (MPS) refers to preferred planning of important materials.
  • C. Long-term planning (LTP) is a long-term form of forecasting.
  • D. Material requirements planning (MRP) includes automatic capacity leveling.

Answer: B

 

NEW QUESTION 27
When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation.
What can be the origin of the formula parameters used for scheduling? (Choose three)

  • A. Standard values in the operations of routings
  • B. General values from work scheduling view of the material master
  • C. User-defined fields in the operation of routings
  • D. General item values of bill of materials
  • E. General operation values of routings

Answer: A,C,E

 

NEW QUESTION 28
A user you advise wishes to transfer variable process instructions for automated processing directly to certain work centers and machines in the production department (for example, feed speed, pressing pressure, dry temperature). The user also wishes to receive variable as-is messages (such as actual quantities, actual times) from these work centers and machines and to process these messages for feedback concerning production orders. Which of the following options would you recommend to implement these requirements?

  • A. SAP Application Link Enabling (ALE)
  • B. SAP Business Intelligence (BI)
  • C. Execution Steps (XSteps) and process messages
  • D. Plant data collection (PP-PDC) interface

Answer: C

 

NEW QUESTION 29
In which of the following objects can you activate back flushing for production orders? (Choose three)

  • A. Routing
  • B. Material master (component)
  • C. Work center
  • D. Material master (finished product)
  • E. Production scheduling profile

Answer: A,B,C

 

NEW QUESTION 30
Which of the following organizational efforts can be minimized using the KANBAN procedure?

  • A. Effort for material staging
  • B. Effort for master data maintenance
  • C. Effort for capacity planning
  • D. Effort for Sales and Operations Planning (SOP)

Answer: A

 

NEW QUESTION 31
Where in the SAP ECC system can you define production versions?

  • A. In the routing
  • B. In the material master
  • C. In the work center
  • D. In the bill of material

Answer: B

 

NEW QUESTION 32
In your company planning strategies are used in the SAP-ECC demand management that are based on consumption. Which of the following statements about consumption is true?
(Choose two.)

  • A. Consumption always takes place on the material level between the planned independent requirements and the planned orders.
  • B. Consumption can also take place between order reservations and planned independent requirements, depending on the strategy.
  • C. A consumption situation is dynamic and is always restructured with the planning run.
  • D. The consumption parameters (consumption mode and consumption interval) can be set in the material master or in the MRP group.

Answer: B,D

 

NEW QUESTION 33
Which Customizing element controls the determination of planned costs in production orders?

  • A. Settlement profile
  • B. Accounting type
  • C. Costing variant
  • D. Calculation procedure

Answer: C

 

NEW QUESTION 34
When testing requirements planning in plant 1000, you receive the error message displayed below. Large numbers of materials are already available in plant 1000. As a first step in solving the problem, you activate requirements planning in the Customizing for plant 1000.

What further tasks do you perform before you can use requirements planning in plant 1000 in SAP ECC?

  • A. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in the MRP views in material master.
  • B. Set up the planning files in Customizing and specify the plant parameters for plant 1000 in Customizing of the MRP group.
  • C. Activate requirements planning in Customizing for MRP areas in plant 1000 and specify the plant parameters for plant 1000 in the MRP views in material master.
  • D. Set up the planning file in Customizing and specify the plant parameters for plant 1000 in Customizing.

Answer: D

 

NEW QUESTION 35
In which of the following objects can you activate backflushing of components if you want to use this functionality during order confirmation? (Choose three.)

  • A. Routing
  • B. Work Center
  • C. Material Master (Finished Product)
  • D. Production Scheduling Profile
  • E. Material Master (Component)

Answer: A,B,E

 

NEW QUESTION 36
Which of the following elements can be used in a process order? (Choose three)

  • A. Process instructions
  • B. Phases
  • C. Relationships
  • D. Suboperations
  • E. Parallel sequences

Answer: A,B,C

 

NEW QUESTION 37
......


SAP C_TSCM42_67 Exam Description:

The certification "SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7" verifies the knowledge in the area of Production for the consultant profile. This certificate proves that the candidate has a basic understanding within this consultant profile and can implement this knowledge practically in projects. The SAP Certified Application Associate can contribute to the success of the planning and implementation phases of the project in a mentored role and would typically have a maximum of three years experience in the solution area. Project experience should not be prerequisite for a competent and well trained candidate to pass this exam.

 

Free Sales Ending Soon - 100% Valid C_TSCM42_67 Exam: https://www.fast2test.com/C_TSCM42_67-premium-file.html

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어