[Feb 10, 2022] Prepare For The C_TS422_2020 Question Papers In Advance [Q14-Q35]

Share

[Feb 10, 2022] Prepare For The C_TS422_2020 Question Papers In Advance

C_TS422_2020 PDF Dumps Real 2022 Recently Updated Questions


SAP C_TS422_2020 Exam Description:

The "SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing" certification exam validates that the candidate possesses the fundamental and core knowledge required of the SAP S/4HANA Manufacturing consultant profile. This certification proves that the candidate has an overall understanding and in‐depth technical skills to participate as a member of a project team in a mentored role.


SAP C_TS422_2020 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Production Orders in SAP S/4HANA > 12%

Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation.

Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.


 

NEW QUESTION 14
If the stock level drops below the reorder stock in reorder point planning, what is the system logic to trigger procurement?

  • A. Fill up to the safety stock level
  • B. Fill up to the maximum stock level
  • C. Fill up based on the lot size procedure
  • D. Fill up to the reorder stock level

Answer: C

 

NEW QUESTION 15
What are possible configuration steps when setting up the alert monitor in Advanced Planning? Note: There are 3 correct answers to this question.

  • A. Create object selection variant for transportation lane-related alerts.
  • B. Create object selection variant for product-related alerts.
  • C. Assign the alert profile to the overall profile.
  • D. Create object selection variant for resource-related alerts
  • E. Assign the overall profile to the authorization profile.

Answer: B,C,D

 

NEW QUESTION 16
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.

  • A. To make the assignment of components easier
  • B. To reduce the number of changes required in bills of material
  • C. To increase the number of planning levels
  • D. Tosimplify the structure of bills of material
  • E. To reduce the number of material masters

Answer: A,B,D

 

NEW QUESTION 17
What does the industry sector determine? Note: There are 2 correct answers to this question.

  • A. Whether material numbers are assigned internally or externally
  • B. Whether a material master fieldis required, changeable, displayed, or hidden
  • C. Which transaction you can use to create a new material
  • D. Which material master views can be maintained

Answer: B,D

 

NEW QUESTION 18
An issue storage location was NOT found through the work center, bill of material (BOM)item, or material master. Whatdetermines whether the storage location can be derived from the production version?

  • A. Plant Data
  • B. MRP Profile
  • C. MRP Controller
  • D. MRP Group

Answer: D

 

NEW QUESTION 19
What is the purpose of a reporting point confirmation in repetitive manufacturing? Note: There are 2 correct answers to this question.

  • A. To determine the work in progress along the production line
  • B. To stage different components for a production line simultaneously
  • C. To provide timely updates of inventory management for the staged components
  • D. To reduce the totalproduction lead time for along production line

Answer: A,C

 

NEW QUESTION 20
When working with both cross-plant and plant-specific material statuses in the mater al master, which status has the highest priority?

  • A. The cross-plant status
  • B. The most restrictive status
  • C. The plant-specific status
  • D. The least restrictive status

Answer: B

 

NEW QUESTION 21
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Kanban
  • B. Picking list
  • C. Transfer Order
  • D. Backflushing

Answer: B

 

NEW QUESTION 22
Which of the following business processes are controlled by parameters that are dependent on production order type? Note: There are 2 correct answers to this question.

  • A. Implementation
  • B. Planning
  • C. Engineering change management
  • D. Inspection during production

Answer: A,B

 

NEW QUESTION 23
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Rate routing
  • B. Control cycle
  • C. Replenishment strategy
  • D. Production supply area

Answer: B

 

NEW QUESTION 24
In the Schedule Production app, which settings can you make in the planning strategy? Note: There are 3 correct answers to this question.

  • A. Fixed pegging (on/off)
  • B. Planning mode (bucket/sequence)
  • C. Scheduling control (finite/infinite)
  • D. Direction (forward/backward)
  • E. Finiteness level (0...1)

Answer: B,C,D

 

NEW QUESTION 25
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
  • B. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • C. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator

Answer: A

 

NEW QUESTION 26
Which SAP solutions support the supplier area in the portfolio of the Digital Value Network? Note: There are
3 correct answers to this question.

  • A. SAP SuccessFactors
  • B. SAP Ariba
  • C. SAP Concur
  • D. SAP Field glass
  • E. SAP C/4HANA

Answer: B,C,D

 

NEW QUESTION 27
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with an alternative sequence in the routing
  • B. A production line with prioritized alternative work centers
  • C. A production line with more than one work center
  • D. A production line with a parallel sequence in the routing

Answer: C

 

NEW QUESTION 28
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a separate resource inthe production data structure.
  • B. Model a handling resource in the location master and goods receipt time in the mater all master.
  • C. Model a transportation resource in the location master.
  • D. Model a resource inbound in the location master.

Answer: B,C

 

NEW QUESTION 29
Which chart types does the tabular planning table provide in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Work center capacities chart
  • B. Orders (dispatched) chart
  • C. Order (pool) chart
  • D. Capacity requirements chart

Answer: A,D

 

NEW QUESTION 30
Mode selection is one of the scheduling options available in Advanced Planning in SAP S/4HANA. When can you use mode selection?

  • A. When multiple planned orders exists in one resource
  • B. When alternate resourcesare used within one operation
  • C. When multiple production versions are maintained for one product
  • D. When multiple operations are maintained for one product

Answer: B

 

NEW QUESTION 31
You are working with planning strategy 40 (Planning-with-final assembly). When does consumption of planned independent requirements take place?

  • A. When you create a sales order
  • B. When the MRP results are saved
  • C. When you deliver a sales order
  • D. When you create a planned order

Answer: A

 

NEW QUESTION 32
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.

  • A. In the MRP controller
  • B. In the routing
  • C. In the production version
  • D. In the production order type
  • E. In the bill of materials (BOM)

Answer: A,B,D

 

NEW QUESTION 33
Which time elements can be reduced by a reductionstrategy? Note: There are 3 correct answers to this question.

  • A. Wait time
  • B. Goods receipt processing time
  • C. Queue time
  • D. Float after production
  • E. Move time

Answer: C,D,E

 

NEW QUESTION 34
Which SAP solutions can be used for forecast ng in Supply Chain Planning? Note: There are 2 correct answers to this question.

  • A. Material Requirements Planning (MRP)
  • B. Supply Chain Management (SCM)
  • C. Capacity Requirements Planning (CRP)
  • D. Integrated Business Planning (IBP)

Answer: B,D

 

NEW QUESTION 35
......


C_TS422_2020 Exam Certification Details:

Sample Questions: SAP C_TS422_2020 Exam Sample Question
Level:Associate
Cut Score:56%

 

C_TS422_2020 Dumps and Practice Test (82 Exam Questions): https://www.fast2test.com/C_TS422_2020-premium-file.html

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어