NEW QUESTION # 14
What happens to the group BOM when you do a plant assignment?

  • A. The internal number becomes new and the BOM usage stays unchanged.
  • B. The internal number and the BOM usage stays unchanged.
  • C. The internal number stays unchanged and the BOM usage becomes new.
  • D. The internal number and the BOM usage becomes new.

Answer: A


NEW QUESTION # 15
You can assign material components to operations.What needs to be taken into account?

  • A. You can only assign material components that have also been assigned to the routing as production resources and tools.
  • B. You can only assign material components that were previously assigned to the header material.
  • C. You can only assign material components that are components of a material BOM.
  • D. You can only assign each material component, when the material master exists and is known in the plant.

Answer: A


NEW QUESTION # 16
Which of the following objects can you connect with a revision level?Note: There are 2 correct Answers to this question.

  • A. Document
  • B. Material Master
  • C. Work Center
  • D. Classes

Answer: A,B


NEW QUESTION # 17
Why is a Work Center assigned to a Cost Center?

  • A. For scheduling to determine transportation time and queue time
  • B. For assignment to find suitable people
  • C. For capacity to use shift sequences
  • D. For costing to use activity types

Answer: D


NEW QUESTION # 18
Which configuration processes/scenarios are supported for both processing modes?

  • A. Plan./Production Order, Order BOM only
  • B. Plan./Production Order, Sales Order (SET) only
  • C. Sales Order (SET), Order BOM only
  • D. Plan./Production Order, Order BOM, Sales Order (SET)

Answer: D


NEW QUESTION # 19
What happens if the characteristic status is not set to Released?

  • A. The characteristic can only be changed.
  • B. A value of this characteristic cannot be assigned in configuration.
  • C. The characteristic cannot be assigned to a class.
  • D. A value of this characteristic cannot be assigned in classification of a configurable material.

Answer: B


NEW QUESTION # 20
You work with a Plan./Production Order without BOM explosion scenario.Which information is available?Note: There are 2 correct Answers to this question.

  • A. In the simulation, information about the BOM and routing is displayed.
  • B. In the simulation, no information about the BOM is displayed except the routing.
  • C. In the sales order, no information about the BOM and routing is displayed.
  • D. In the sales order, no information about the BOM is displayed except the routing.

Answer: A,D


NEW QUESTION # 21
How can you set up a class hierarchy?Note: There are 2 correct Answers to this question.

  • A. Using class hierarchy maintenance.
  • B. Using a class BOM.
  • C. Using object links.
  • D. Assigning a class to a superior class.

Answer: A,D


NEW QUESTION # 22
You can use the syntax element $set_pricing_factor for pricing in object dependencies.What do you need to consider?Note: There are 2 correct Answers to this question.

  • A. $set_pricing_factor adds only one factor. The variant condition must already be assigned.
  • B. You cannot use zero as a factor in $set_pricing_factor.
  • C. $set_pricing_factor sets the variant condition and adds a factor to it. The variant condition must not already be assigned.
  • D. Negative factors must not be used in $set_pricing_factor.

Answer: B,C


NEW QUESTION # 23
You connected characteristics inside one class to organizational areas. What are the benefits?Note:
There are 2 correct Answers to this question.

  • A. A check for the same classification is only possible inside one organizational area.
  • B. Users can only work with characteristics depending on the authorization for a particular organizational area.
  • C. Users can always see all characteristics for all areas.
  • D. A check for the same classification is possible for all organizational areas.

Answer: A,D


NEW QUESTION # 24
What is the advantage of the Engineering Workbench in comparison to standard material BOM and routing maintenance?Note: There are 3 correct Answers to this question.

  • A. Material BOMs, routings, work centers, and material masters can be created and changed.
  • B. You can save changes to material BOMs and/or routings and release them for other persons without leaving the Engineering Workbench.
  • C. Material BOMs and routings can be processed together.
  • D. Using a special, optional lock logic, several people can make changes to the same material BOMs and/or routings.
  • E. Only the Engineering Workbench allows you to make changes to material BOMs and routings using Engineering Change Management.

Answer: B,C,D


NEW QUESTION # 25
Which features are available when working with the Manage Documents app?Note: There are 2 correct Answers to this question.

  • A. A secure storage area can be selected manually.
  • B. A secure storage area is selected automatically.
  • C. An object link to every SAP Object can be defined.
  • D. All information is displayed on only one page.

Answer: B,D


NEW QUESTION # 26
You work with cross-plant and plant-specific Product Master statuses. Which status has the highest priority?

  • A. The most restrictive status.
  • B. The plant-plant specific status.
  • C. The cross-plant status.
  • D. The least restrictive status.

Answer: C


NEW QUESTION # 27
In a single-level configuration, you want to use a constraint so that if characteristic C1 has the value V1, then characteristic C2 is assigned the value V2.C1 and C2 are assigned to class (300)T_FCL00.What would be a correct complete constraint?

  • A. RESTRICTION: (300)T_FCL00.C2 = 'V2' if (300)T_FCL00.C1 = 'V1'
  • B. RESTRICTION: $self.C2 = 'V2' if $self.C1 = 'V1'
  • C. RESTRICTION: ?C2 = 'V2' if ?C1 = 'V1'
  • D. RESTRICTION: ?T_FCL00.C2 = 'V2' if ?T_FCL00.C1 = 'V1'

Answer: A


NEW QUESTION # 28
What controls the material BOM item category?Note: There are 2 correct Answers to this question.

  • A. A negative quantity is allowed.
  • B. A change number is required.
  • C. A material number is required.
  • D. A work center is required.

Answer: A,C


NEW QUESTION # 29
You activate the check for same classification inside basic data screen of your class. Which restrictions are available?
Note: There are 2 correct Answers to this question.

  • A. The classification is only checked for objects connected to several classes.
  • B. The classification is only checked when you have assigned values to all characteristics.
  • C. The classification is only checked when you have assigned values to some characteristics.
  • D. The classification is only checked for objects connected to one class.

Answer: B,D


NEW QUESTION # 30
A procedure sets the value V2 for characteristic C2 when the value V1 is set for characteristic C1.How do you assign and define this procedure?Note: There are 3 correct Answers to this question.

  • A. Procedure to characteristic C2 using the following syntax: $self.C1 = 'V1' if $self.C2 = 'V2' (not recommended)
  • B. Procedure to the value V2 with the following syntax: $self.C1 = 'V1' (not recommended)
  • C. Procedure to the value V1 with the following syntax: $self.C2 = 'V2' (not recommended)
  • D. Procedure with the following syntax to the configuration profile: $self.C2 = 'V2' if $self.C1 = 'V1' (recommended)
  • E. Procedure to characteristic C1 using the following syntax: $self.C2 = 'V2' if $self.C1 = 'V1' (not recommended)

Answer: C,D,E


NEW QUESTION # 31
Where can you create routings?Note: There are 3 correct Answers to this question.

  • A. In the classic transaction or corresponding Fiori app for the creation of routings (CA01)
  • B. In Product Structure Synchronization
  • C. In the classic transaction or corresponding Fiori app for Variant Configuration Modeling Environment (PMEVC)
  • D. In the classic transaction or corresponding Fiori app for the Engineering Workbench (CEWB)
  • E. In Visual Manufacturing Planner

Answer: A,D,E


NEW QUESTION # 32
......

C_TS411_2022 Dumps and Practice Test (80 Exam Questions): https://www.fast2test.com/C_TS411_2022-premium-file.html

Released SAP C_TS411_2022 Updated Questions PDF: https://drive.google.com/open?id=1sr86FRA0iN4476Ek1iw_xRYshiWrPEb5

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어