C_TS422_2022 100% Guarantee Download C_TS422_2022 Exam PDF Q&A [May 30, 2024]
Get C_TS422_2022 Actual Free Exam Q&As to Prepare for Your SAP Certification
NEW QUESTION # 42
What data can you maintain in the subitems of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Quantity
- B. Item type
- C. Installation point
- D. Scrap percentage
Answer: A,C
NEW QUESTION # 43
Which information is required when you create a product master in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. Product type
- B. Selection screen for views
- C. Selection screen for plants
- D. Base unit of measure
Answer: A,B
NEW QUESTION # 44
What could be the reason for different combinations of components in a multiple bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. BOM header status
- B. BOM item status
- C. Manufacturing date
- D. Lot size
Answer: C,D
Explanation:
A multiple bill of material (BOM) is a type of BOM that allows for different combinations ofcomponents or raw materials for the same assembly or subassembly. The reason for different combinations of components in a multiple BOM could be the manufacturing date or the lot size. The manufacturing date determines the validity period of the BOM, which means that different BOMs can be valid for different time intervals. For example, a BOM can be changed due to a design modification or a change in the availability of components.
The lot size determines the quantity-dependent explosion of the BOM, which means that different BOMs can be used for different production quantities. For example, a BOM can be optimized for different batch sizes or different production methods. References: Multiple BOM, BOM Explosion
NEW QUESTION # 45
In the Capacity Scheduling Table, which settings can you select for the planning strategy?
Note: There are 3 correct answers to this question.
- A. Direction
- B. Fixed pegging
- C. Scheduling control
- D. Planning mode
- E. Finiteness level
Answer: A,C,E
Explanation:
The planning strategy settings in the Capacity Scheduling Table determine how the system schedules the operations or orders on the resources. You can select the following settings:
Finiteness level: This setting defines how strictly the system considers the capacity availability of the resources when scheduling. You can choose between infinite, finite, and optimized scheduling. Infinite scheduling ignores the capacity availability and schedules the operations or orders as early as possible.
Finite scheduling respects the capacity availability and schedules the operations or orders only in the free slots of the resources. Optimized scheduling tries to find the best compromise between infinite and finite scheduling by minimizing the delays and overloads12 Scheduling control: This setting defines how the system handles the scheduling conflicts that may arise when scheduling the operations or orders. You can choose betweenrescheduling, shifting, and splitting.
Rescheduling means that the system moves the conflicting operations or orders to a later date. Shifting means that the system moves the conflicting operations or orders to another resource within the same resource network. Splitting means that the system splits the conflicting operations or orders into smaller parts and schedules them on different resources or dates13 Direction: This setting defines the direction of the scheduling. You can choose between forward and backward scheduling. Forward scheduling means that the system schedules the operations or orders from the start date to the end date. Backward scheduling means that the system schedules the operations or orders from the end date to the start date14 References:
Planning Strategy Settings - SAP Help Portal
Finiteness Level - SAP Help Portal
Scheduling Control - SAP Help Portal
Direction - SAP Help Portal
NEW QUESTION # 46
Which time elements can be reduced by a reduction strategy?
Note: There are 3 correct answers to this question.
- A. Move time
- B. Goods receipt processing time
- C. Float after production
- D. Wait time
- E. Queue time
Answer: A,D,E
Explanation:
A reduction strategy is a method of shortening the lead time of an order by reducingcertain time elements in the order scheduling1. The time elements that can be reduced by a reduction strategy are move time, wait time, and queue time2. Move time is the time required to move a material from one operation to another. Wait time is the time between the end of an operation and the start of the next operation. Queue time is the time before an operation can start at a work center due to the work center's capacity utilization3. These time elements can be reduced by a percentage or a fixed value in the reduction strategy. References: 1: Reduction Strategy | SAP Help Portal(https://blog.sap-press.com/4-strategies-for-make-to-stock-production-with-sap-s4hana)2: 4 Strategies for Make-to-Stock Production with SAP S/4HANA(https://blogs.sap.com/2022/03/22/highlights-for-manufacturing-in-sap-s-4hana-2021-part-2-productio Scheduling | SAP Help Portal(https://blogs.sap.com/2022/04/26/manufacturing-in-sap-s-4hana-cloud-planning-strategies/).
NEW QUESTION # 47
When you create a sales order
When can consumption of planned independent requirements take place for planning strategy 40 (Planning with final assembly?
- A. When MRP creates a planned order
- B. When MRP creates a planned order
- C. When MRP creates a dependent requirement
- D. When you create a sales order
Answer: D
Explanation:
Planning strategy 40 (Planning with final assembly) is a make-to-stock strategy that uses planned independent requirements to trigger the procurement and production of the necessary assemblies and components before receipt of the sales orders. As soon as the sales order is received, it consumes the planned independent requirements and adjusts the master plan to suit the current requirements situation. This means that the important feature of this planning strategy is that you can react quickly to customers' requirements. The consumption of planned independent requirements can take place when you create a sales order, as well as when you change or delete a sales order. References: Planning with Final Assembly (40), Sample Scenario:
Strategy 40, Outlining Make-to-Stock Production
NEW QUESTION # 48
Your company manufactures materials whose specifications differ for each manufacturing process. Which application do you have to use in SAP S/4HANA to be able to track and use this information in all areas of logistics?
- A. Engineering change management
- B. Batch management
- C. Process order management
- D. Quality management
Answer: B
NEW QUESTION # 49
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 Correct answers to this question.
- A. Determine a time period with available capacity on the planning board.
- B. Execute an infinite production planning run for the critical resources.
- C. Increase the capacity supply in a time-phased interval.
- D. Reduce the planning Window.
- E. Form optimum sequence to reduce setup times.
Answer: A,C,E
Explanation:
Increase the capacity supply in a time-phased interval: You can use the capacity planning table or the capacity planning board to increase the available capacity of a resource by changing the shift sequence, the shift duration, or the number of individual capacities. You can also use the capacity leveling function to distribute the capacity requirements over a longer time horizon. This way, you can avoid capacity overloads and create a balanced capacity load.
Determine a time period with available capacity on the planning board: You can use the planning board to visualize the capacity load and the capacity availability of a resource in a graphical Gantt chart. You can use the filter and zoom functions to focus on a specific time period and resource. You can also use the capacity evaluation function to display the capacity situation in a tabular or graphical form. This way, you can identify the time periods with available capacity and plan the operations accordingly.
Form optimum sequence to reduce setup times: You can use the setup matrix or the setup group key to define the setup times and the setup categories for a resource. You can also use the setup optimization function to determine the optimum sequence of operations that minimizes the total setup time. This way, you can reduce the capacity consumption and increase the throughput of the resource. References: Identifying the Basic Principles and Tools of Capacity Planning; SAP Help Portal;
[SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 82.
NEW QUESTION # 50
Why would you use phantom assemblies? Note: There are 3 correct answers to this question.
- A. To reduce the number of changes required in bills of material
- B. To increase the number of planning levels
- C. To make the assignment of components easier
- D. To reduce the number of material masters
- E. To simplify the structure of bills of material
Answer: C,D,E
Explanation:
Phantom assemblies are assemblies that have their own product structure, but whose assembly does not actually physically exist. The components of the phantom assembly are incorporated directly in the superordinate product. The product structure of the superordinate product contains a reference to the phantom assembly. You can use phantom assemblies for the following purposes:
To simplify the structure of bills of material: Phantom assemblies allow you to group components that belong together logically or functionally, without creating an additional level in the product structure.
This can make the product structure easier to maintain and understand.
To reduce the number of material masters: Phantom assemblies do not require a material master record in SAP S/4HANA, as they are not physically produced or stored. This can save storage space and reduce the effort of creating and updating material masters.
To reduce the number of changes required in bills of material: Phantom assemblies can be used to represent common subassemblies that are used in multiple products. This way, you only need to maintain the product structure of the phantom assembly once, and any changes will be reflected in all the products that reference it.
Phantom assemblies do not increase the number of planning levels, as they are not considered as separate planning objects. They also do not make the assignment of components easier, as the components are assigned to the superordinate product, not to the phantom assembly. References: Phantom Assembly | SAP Help Portal, Phantom Assembly | SAP Help Portal, Planning Phantom Assemblies | SAP Help Portal.
NEW QUESTION # 51
You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place?
- A. The new operation is inserted at the desired time; the previously dispatched operation is moved backward
- B. The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.
- C. The new operation is inserted at the desired time; the previous dispatched operation is moved forward.
- D. The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.
Answer: A
NEW QUESTION # 52
Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?
Note: There are 2 correct answers to this question.
- A. Use the Batch Information Cockpit.
- B. Use batch determination
- C. Use batch derivation.
- D. Use the batch where-used list.
Answer: A,D
NEW QUESTION # 53
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.
- A. Create by order release
- B. Create in Kanban process
- C. Create without material
- D. Convert a purchase requisition
Answer: A,B
Explanation:
You can create a production order using the following methods:
Create by order release: You can create a production order by releasing a planned order in the material requirements planning (MRP) run. The system converts the planned order into a production order and assigns a production order number. You can use the Manage Production Orders app or the transaction CO40 to create production orders by order release.
Create in Kanban process: You can create a production order in the Kanban process, which is a lean manufacturing method that uses pull signals to trigger production. The system creates a production order when a Kanban status changes from EMPTY to WAITING. You can use the Kanban Board app or the transaction PK13N to create production orders in the Kanban process. References: SAP Help Portal, Manage Production Orders in SAP S/4HANA Manufacturing
NEW QUESTION # 54
What do you need to consider when working with material master numbering in SAP S/4HANA?
Note: There are 2 correct answers to this question.
- A. The maximum material number length is 40 for external numbers and 18 for internal numbers
- B. Material numbering is defined cross-client.
- C. The maximum material number length is 18 for external numbers and 18 for internalnumbers.
- D. Material numbering is defined at client level.
Answer: A,D
NEW QUESTION # 55
How can you support a GMP (Good Manufacturing Practice)-compliant production process?
Note: There are 3 correct answers to this question.
- A. GMP-compliant flag
- B. Digital signature
- C. Recipe approval
- D. Batch record
- E. Approved resources
Answer: B,C,D
Explanation:
To support a GMP-compliant production process, you can use the following features in SAP S/4HANA:
Digital signature: This allows you to electronically sign documents and transactions that are relevant for GMP compliance, such as production orders, process orders, batch records, and quality inspections. Digital signatures ensure the authenticity, integrity, and non-repudiation of the documents and transactions12.
Batch record: This is a document that records the entire production process of a batch, including the materials, resources, operations, quality data, and signatures involved. Batch records provide traceability and documentation for GMP compliance3 .
Recipe approval: This is a process that ensures that only approved recipes can be used for production.
Recipes are approved by authorized users who sign them digitally. Recipe approval prevents unauthorized changes and ensures consistency and quality of the products .
References:
1: SAP Help Portal: Digital Signature
2: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 8: Product Compliance
3: SAP Help Portal: Batch Record
4: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 8: Product Compliance
5: SAP Help Portal: Recipe Approval
6: SAP S/4HANA Production Planning and Manufacturing Certification Guide, Chapter 7: Process Orders
NEW QUESTION # 56
How can a material availability check be triggered automatically for a production order?
Note: There are 2 correct answers to this question.
- A. By order confirmation
- B. By capacity planning
- C. By order release
- D. By mass processing
Answer: C,D
Explanation:
A material availability check can be triggered automatically for a production order by the following methods:
By mass processing: You can use the mass processing function to execute material availability checks for multiple production orders at once. You can use the Manage Production Orders app or the transaction COHV to perform mass processing. You can define the selection criteria and the scope of check for the orders to be checked. The system updates the availability status and the committed quantities for the checked orders.
By order release: You can configure the system to trigger a material availability check automatically when a production order is released. You can use the Customizing activity Define Checking Control to define the checking rule and the scope of check for the order release. The system updates the availability status and the committed quantities for the released order. References: Executing Material Availability Checks; [SAP S/4HANA Production Planning and Manufacturing Certification Guide], page 83.
NEW QUESTION # 57
Which of the following questions do you have to answer before you start creating a bill of material (BOM)?
- A. Which base unit of measure does the material have?
- B. What status does the BOM have?
- C. Is the material type allowed in the BOM?
- D. In which storage location is the BOM required?
Answer: A,C
NEW QUESTION # 58
Which of the following elements does MRP take into account during net requirement calculation? Note:
There are 2 correct answers to this question.
- A. Forecast key figures
- B. Safety Stock
- C. Purchase orders
- D. Maximum stock level
Answer: A,B