NEW QUESTION # 90
Which are prerequisites for scope item Production Subcontracting - External Processing (BJK)? (2 correct)

  • A. A contract
  • B. A production order with an operation executed externally
  • C. A vendor
  • D. An alternative work center

Answer: B,C


NEW QUESTION # 91
According to the SAP Activate methodology, in which phase are the scope item Fit-to-Standard workshops executed?

  • A. Realize
  • B. Deploy
  • C. Explore
  • D. Prepare

Answer: C


NEW QUESTION # 92
What is the first step in the process flow of the SAP Best Practices Scenario Make-to-Order Production
-Semi-finished Goods Planning and Assembly (IBM)?

  • A. Create purchase order for raw material
  • B. Create planned independent requirements for semi-finished product
  • C. Create sales order for finished product
  • D. Create production order for semi-finished product

Answer: B


NEW QUESTION # 93
What information is shown in the Display Inspection Methods app? (3 correct)

  • A. Usage decision
  • B. Administrative data
  • C. Quality notifications
  • D. Master inspection characteristics related to the inspection method
  • E. Documents that are linked to the inspection method

Answer: B,D,E


NEW QUESTION # 94
Why is de-coupling your extensions from SAP S/4 HANA Cloud required? (2 correct)

  • A. To enhance existing functionality within the application itself
  • B. To ensure extensions do not conflict with SAP software updates
  • C. To guarantee the stability of the system
  • D. To allow customers to take advantage of predefined user exits

Answer: B,C


NEW QUESTION # 95
In which implementation phase do you perform data load preparation?

  • A. Explore
  • B. Realice
  • C. Deploy
  • D. Prepare

Answer: B


NEW QUESTION # 96
What are some characteristics of SAP HANA Enterprise Cloud? Note: There are 3 correct answers to this question.

  • A. It is an Infrastructure as a Service (IaaS) plus managed services
  • B. Customers can bring their own licensed SAP applications.
  • C. It is a Platform as a Service (PaaS) plus managed services.
  • D. SAP runs your application in a shared environment
  • E. Services include provisioning, patching, and upgrading.

Answer: A,B,E


NEW QUESTION # 97
An SAP Central Business Configuration, what does the "Confirm Scope and Organizational Structure is Completed" milestone trigger in the Implementation Project?

  • A. Installation of the Starter System
  • B. Installation of the Production System
  • C. Initial Transport from Quality to Production
  • D. Installation of the Quality System

Answer: B


NEW QUESTION # 98
Where do you specify the retention time of temporary data in the SAP S/4HANA Migration Cockpit?

  • A. In the staging tables
  • B. In the migration project
  • C. In the migration object
  • D. In the migration object template

Answer: D


NEW QUESTION # 99
What is the purpose of the Starter system in the SAP S/4 HANA Cloud implementation project?

  • A. To conduct a blueprint workshop identify all customer requirements for a completely customized solution
  • B. To demonstrate SAP Best Practices processes in a preconfigured system and identify customer personalization requirements
  • C. To configure the customer's personalized solution for demonstration and testing during the Realize u phase
  • D. To demonstrate the customer's personalized solution, including process flows, the organizational structure, and authorizations

Answer: B


NEW QUESTION # 100
What is the purpose of the Fit-to-Standard workshop?

  • A. To alter the standard SAP processes so that they fit with the customer's requirements
  • B. To identify gaps between customer business processes and SAP standard processes
  • C. To design enhancements to cover the gaps between business processes and SAP standard accesses
  • D. To map the standard SAP roles to people in the organization

Answer: B


NEW QUESTION # 101
Which overview cards are available in the Quality Technician Overview app? (2 correct)

  • A. Inspection lots with open results for inspection points
  • B. Inspection lots without inspection plan
  • C. Inspection lots without usage decision
  • D. Top defective materials

Answer: A,B


NEW QUESTION # 102
Which ways of posting goods issues does the Make-to-Stock Production - Process Manufacturing (2UG) scope item support? (3 correct)

  • A. Goods issue of batch managed components manually
  • B. Component backflush during production confirmation
  • C. Order-specific goods issue posting via action control key
  • D. Goods issue of batch managed components via pick list
  • E. Goods issue via backlog list and post processing records

Answer: A,B,D


NEW QUESTION # 103
What are capabilities of the Integration of SAP Manufacturing Execution to Production Operation (2JN) scope item? (2 correct)

  • A. Reschedule on alternative work center automatically in case of an unexpected downtime of the standard work center
  • B. Use product variants with a lot size of one and the ability to change their production sequence automatically
  • C. Manage both work-in-process data and master data in one single manufacturing execution system
  • D. Deliver real-time transparency of production operations and KPIs with complete traceability based on as-built records

Answer: B,D


NEW QUESTION # 104
Which new option is available for predictive Material Requirements Planning (pMRP) as of SAP S/4HANA Cloud 2005?

  • A. The usage of material variants
  • B. The usage of configuration BOM
  • C. The usage of production resources / tools
  • D. The usage of spare parts planning

Answer: B


NEW QUESTION # 105
Which issue type is shown by the Display MRP Material Issues app used in the Material Requirements Planning (J44) scope item?

  • A. No BOM explosion due to missing config.
  • B. Opening date in the past
  • C. Order proposal has been manually changed
  • D. Material status prevents usage in MRP

Answer: A


NEW QUESTION # 106
Which capabilities do the SAP Fiori apps Manage Material Coverage and Monitor Material Coverage support in the SAP Best Practices Scenario Make-to-Stock Production - Discrete Manufacturing (BJ5)? (2 correct)

  • A. Create purchase requisitions
  • B. Open the delivery schedule for materials with scheduling agreements
  • C. Approve purchase orders
  • D. Choose a different shortage definition

Answer: B,D


NEW QUESTION # 107
What can you use to define Kanban control cycles in the SAP Best Practices Scenario Manufacturing with Kanban Supply into Production (IE3)? *

  • A. SAP Fiori app
  • B. Expert Configuration
  • C. Self Service Configuration UI
  • D. System pre-calculation

Answer: C


NEW QUESTION # 108
Which process does the new identity and Access Management app Manage Business Role Changes After Upgrade support?

  • A. Initial system deployment
  • B. Quarterly system upgrades
  • C. Transfers from quality system
  • D. New extensibility implementations

Answer: B


NEW QUESTION # 109
Which key features does the Manage Work Center Capacity app provide? (2 correct)

  • A. Detect overload situations based on time buckets such as weeks
  • B. Manage shifts for a work center to enable better utilization
  • C. Use an optimizer for automated capacity leveling of a bottleneck resource
  • D. Navigate to the heuristics framework to access advanced planning

Answer: A,B


NEW QUESTION # 110
In the Quality Engineer Overview app, which types of inspection lots can you view? (2 correct)

  • A. Inspection lots without a quality engineer assignment
  • B. Inspection lots without an inspection lot number
  • C. Inspection lots without an inspection plan
  • D. Inspection lots without a usage decision

Answer: B,C


NEW QUESTION # 111
What new functionality was added with SAP S/4HANA Cloud 2008 for data source extensions of SAP fields? (2 correct)

  • A. Custom data source
  • B. Individualize labels
  • C. Value help
  • D. Default value

Answer: B,C


NEW QUESTION # 112
You apply the Integration of Manufacturing Execution System to Production Operation (1Y5) scope item and the production supervisor changes the quantity of a released production order in SAP S/4 HANA Cloud. What is the consequence for the corresponding shop order in the shop floor system?

  • A. The shop order is updated asynchronously by a daily background job
  • B. The shop order is changed automatically in the shop floor system
  • C. The shop order is deleted and a new shop order with the new quantity is created
  • D. The shop order is flagged for manual change in the shop floor system

Answer: B


NEW QUESTION # 113
Which tasks can you perform with the Maintain PIRs app? (2 correct) *

  • A. Maintain the settings for consumption
  • B. Find materials with an insufficient reach
  • C. Identify material status issues
  • D. Select the planning strategy

Answer: A,B


NEW QUESTION # 114
......

100% Free SAP Certified Application Associate C_S4CMA_2308 Dumps PDF Demo Cert Guide Cover: https://www.fast2test.com/C_S4CMA_2308-premium-file.html

PDF Exam Material 2023 Realistic C_S4CMA_2308 Dumps Questions: https://drive.google.com/open?id=1awTly7-NMjRlmnHAdlTI-yH-wiQo0Mwm

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어