NEW QUESTION # 115
- Arreter ou diminuer la
perfusion
- Aviser le md
- Positionner le client en
decubitus dorsal
- Administration diuretique (si prescrit)
- Administration O2
- A. Soins et tx en cas de migration du catheter (2)
- B. Soins et tx en cas de surcharge liquidienne (5)
- C. Soins et tx en cas d,infection locale (2)
- D. Soins et tx en cas d,une occlusion (4)
Answer: B
NEW QUESTION # 116
-Site d'insertion
-Permeabilite
-Irrigation
-Verrouillage
-Tubulures, contenants et ajouts
-Connecteurs sans aiguille et rallonge avec connecteur sans aiguille
-Aiguille a pointe non perforante (Huber - DAVSC)
-Selon le type de DAV et dispositif de stabilisation
-Pansement
- A. Pourquoi retire t-on le catheter? (5)
- B. elements de surveillance des DAV (9)
- C. Quels sont les 3 types de migrations?
- D. Soins et tx en cas d,une occlusion (4)
Answer: B
NEW QUESTION # 117
The application of knowledge, skills, tools, and techniques to project activities to meet project requirements
- A. Project charter
- B. Project scope
- C. Project schedule
- D. Project management
Answer: D
NEW QUESTION # 118
In a project network diagram, the series of activities that deines the duration or earliest completion time of the project
- A. Project Scope
- B. Burst Activity
- C. Critical Path
- D. Merge Activity
Answer: C
NEW QUESTION # 119
Il existe des agents de repermeabilisation selon le precipite ayant engendre l'occlusion. (PRESCRIT)
-Envoyer l'agent de dissolution prepare par la pharmacie
-Surveiller la presence d'effets secondaires (ethanol)
-Aspirer l'agent suite a la repermeabilisation
- A. Quand doit-on considere un anaphylaxie?
- B. Pourquoi est-il essentiel de verifier la compatibilite?
- C. Que doit-on faire s,il y a une occlusion chimique?
- D. Causes d,un reaction allergique ou lesion cutanee (4)
Answer: C
NEW QUESTION # 120
-Nombres de lumieres du DAV
-Materiaux de fabrication du DAV
-Dispositifs de maintien en place du DAV
-Pansement couvrant le DAV
-Duree de port du DAV
-Caracteristiques des mx IV administres
-Dispositif d'administration des mx
-Caracteristiques de l'usager
-Insertion et site d'insertion du DAV
-Soins et entretien du DAV
- A. Facteurs de risques specifiques a la migration du catheter (10)
- B. Inconvenients des dispositifs veineux centraux (CVP et CVCIVP)
- C. Soins et tx en cas d,un reaction allergique ou lesion cutanee
- D. Avantages des dispositifs veineux centraux
Answer: A
NEW QUESTION # 121
-Agent fibrinolytique (tPA).
-Toujours se refere au protocole de l'etablissement.
-Repartir la dose recommandee lorsque plus d'une lumieres DAVC sont obstruees.
-Dose calculee en fonction du poids en Kg
-eviter l'administration concomitante d'un anticoagulant
- A. Que doit-on faire s,il y a une occlusion chimique?
- B. Que doit-on faire s,il y a une occlusion thrombotique?
- C. Quels sont les 3 indications d,une occlusion chimique?
- D. Quels sont les complications possibles d,une voie centrale? (7)
Answer: B
NEW QUESTION # 122
Project Objective Statement (POS) contents
- A. Learning curve analysis
- B. Limits and exclusions
- C. Project network rules
- D. Scope, schedule, resources
Answer: D
NEW QUESTION # 123
Think CSM and PSM, but on a larger, broader scale. The Certified SAFe professionals demonstrate their ability to support company directives and lead transformations in a lean and agile at an enterprise level. There are several levels of SAFe certifications.
- A. Large-scale scrum (less)
- B. Scaled Agile Framework (SAFe)
- C. Disciplined Agile Delivery (dad)
- D. Disciplined Agile Coach (dac)
Answer: B
NEW QUESTION # 124
Schedule development techniques
- A. Review and define organizational ideals.set long-range goals and objectives.analyze and formulate strategies.implement strategies through projects.
- B. Difficult to show the precedence relationships between activities.Hard to plan on compensating for lateness.
- C. The amount of labor hours required to complete a given task or unit of a product will be less each time the task is undertaken.The labor hours will decrease at a decreasing rate.The reduction in labor hours will follow a negative exponentials function.
- D. mathematical analysis, resource leveling heuristics, duration compression, and project management software.
Answer: D
NEW QUESTION # 125
A certified scheduling professional has the knowledge and skill to drive the improved management of project schedules.
- A. PMI Risk Management Professional (RMP)
- B. PMI Scheduling Professional (SP)
- C. Pmi portfolio management professional (pfmp)
- D. Pmi agile hybrid project pro (ahpp)
Answer: B
NEW QUESTION # 126
-Cancer : chimio/ mx irritants
-Infection : Atb long terme
-Douleur : Analgesique long terme
-Mx risque de phlebite
-Remplacement nutrionnel : nutrition parenteral total
-echantillon sanguin : bcp de prelevements sur une courte duree
-Transfusion : rapidement
-Insuffisance renale : hemodialyse (tx aigu)
-Choc/brulure : perfusion de volume important de liquide de remplacement
-Surveillance hemodynamique (canule) : mesure de la PVC
- A. Facteurs de risques specifiques a la migration du catheter (10)
- B. Soins et tx en cas d,un reaction allergique ou lesion cutanee
- C. Quels sont les 3 indications d,une occlusion chimique?
- D. Quels sont les indications pour un catheter veineux central? (10)
Answer: D
NEW QUESTION # 127
Charter Inputs
- A. Review and define organizational ideals.set long-range goals and objectives.analyze and formulate strategies.implement strategies through projects.
- B. program
- C. Work Breakdown Structure, Historical information from similar projects in the past, Project objective and scope statement, Knowledge of resources available, Organizational policies
- D. Narrative description of products, services, or results to be delivered by the project. (business case, product scope description, strategic plan).
Answer: D
NEW QUESTION # 128
A network analysis technique used to predict project duration by analyzing which sequence of activities (path) has the least amount of scheduling flexibility (slack or float)
- A. Critical path method
- B. Cost estimation
- C. Work breakdown structure
- D. Pert
Answer: A
NEW QUESTION # 129
PMP
- A. Project Management Professional
- B. Precedence Diagramming Method
- C. Project management institute scheduling professional
- D. project management
Answer: A
NEW QUESTION # 130
Forum where PMs meet regularly to discuss industry best practices.
- A. Pmi Agile Hybrid Project Pro (ahpp)
- B. Community of Practice
- C. Cross-functional Team
- D. Task Force
Answer: B
NEW QUESTION # 131
......
Best way to practice test for PMI DAVSC: https://www.fast2test.com/DAVSC-premium-file.html
DAVSC Dump Ready - Exam Questions and Answers: https://drive.google.com/open?id=1Y8okmeInXZ_LNox7V-P3TO4F16-sXGst