NEW QUESTION # 87
You need to resolve the production manager issue.
How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation

Reference:
https://docs.microsoft.com/en-us/dynamicsax-2012/appuser-itpro/about-production-parameters-in-manufacturing


NEW QUESTION # 88
You are the production supervisor in charge of setting effective cost prices for the labor force in a manufacturing company.
It is the end of the year and the labor rates have been recalculated based on new salary data.
You need to update the effective labor costs for all labor groups.
Which element must be updated?

  • A. shared category
  • B. cost category
  • C. production orders
  • D. resource group
  • E. cost groups

Answer: B


NEW QUESTION # 89
An inventory control clerk manages adjustments in inventory.
Some adjustments have a cost impact. Other adjustments must be posted to a specific ledger account or must be registered in inventory.
You need to configure the system.
Which journal types should you use? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 90
You are responsible for training the operations staff on production transactions in Dynamics 365 for Finance and Operations. The company uses backflushing for material consumption principles.
You need to train the operators on how to report unintended scrap.
What are two possible ways to achieve this goal? Each correct answer presents a complete solution.
NOTE: Each correct selection is worth one point.

  • A. Post additional materials in a picking list journal
  • B. Report additional time in route card journal
  • C. Report an additional good quantity at Report as finished
  • D. Report an error quantity at Report as finished

Answer: A,D


NEW QUESTION # 91
A manufacturer produces HDMI cables. Typically, the item is manufactured.
The manufacturer will occasionally buy unbranded HDMI cables from a vendor in order to keep up with demand. The company must use the same item number whether they make or buy the item.
What should you do?

  • A. Select route type as vendor on the route operation when the item is to be purchased.
  • B. Create a new vendor resource when the item is to be purchased
  • C. In default order settings, select Production for the default order type
  • D. In default order settings, select Purchase for the default order type

Answer: A


NEW QUESTION # 92
A company that uses Lean manufacturing concepts to produce paper plates has redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers. Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:


NEW QUESTION # 93
You need to calculate estimated consumption of ingredients for liquid cleaning solution.
What is the consumption? To answer, select the appropriate option in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

Explanation


NEW QUESTION # 94
A company implements Dynamics 365 Supply Chain Management.
Due to increased demand and limited space in the work cell area for product L0050, you must subcontract overflow work to another company. You have the following requirements:
* Locate a warehouse at the subcontractor building.
* Support picking and shipping activity tracking.
* Associate costs of transporting materials between the locations in the cost of the finished product.
You need to modify the production flow.
Which three actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Create transfer activities and assign them to the subcontractor
  • B. Create a resource and work cell resource group for the subcontractor
  • C. Modify the overflow work operation and associate it with the subcontractor
  • D. Modify the overflow work activity and assign it to subcontractor
  • E. Create a new production flow version

Answer: A,B,D

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/manage-subcontract-work-produ


NEW QUESTION # 95
You are building the Bill of materials (BOM) for a new production item. The new item has a subcomponent.
Subproduction orders for the subcomponent must be created when estimating production orders.
You need to configure the BOM line to generate subproduction orders.
Which BOM line type should you use?

  • A. Item
  • B. Vendor
  • C. Pegged supply
  • D. Phantom

Answer: C

Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/production-control/bill-of-materi


NEW QUESTION # 96
You are a process engineer evaluating Lean vs. Discrete processing. You want to convert a Kanban item. This item has the following Lean setup:
* The setup uses a Lean schedule group with a throughput ratio = 2.
* The process activity tied to production flow has the following runtime activity times: time = 3 min, per quantity = 1.
* The work cell capacity has a model type of Throughput and an average throughput quantity of 60 per a capacity period of standard workday (8 hour day).
* The throughput is 10 per hour.
You need to set up a Discrete operation to mirror the item's production flow activity.

  • A. Create a route with a runtime = 6, a process quantity = 1, and the operation's hours/time = 1.
  • B. Create a route with a runtime = 1, a process quantity = 10, and the operation's "hours/time = 1.
  • C. Create a route with a runtime = 1, a process quantity = 1, and the operation's hours/time = 0.0167 (e.g. 1 hour/ 60 minutes).
  • D. Create a route with a runtime = 1, a process quantity = 6, and the operation's hours/time = 1.

Answer: B

Explanation:
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/tasks/define-lean-schedule-groups


NEW QUESTION # 97
You need to meet the needs for the large teakwood furniture order.
What must you configure? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 98
You are the product manager at an orange juice manufacturing company.
For every 1,000 pounds of orange juice, 20 pounds of orange pulp is created which can be sold or reused profitably. The cost is calculated as a weighted average between the quantity of orange juice that is reported as finished and the orange pulp based on the standard cost of each item.
You need to create the formula for orange juice that will produce orange pulp as a result of finishing a batch order.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation


NEW QUESTION # 99
Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.
After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.
A company uses Dynamics 365 Supply Chain Management to manage production configuration.
A product designer creates a remote control toy that can be purchased with different tire sizes.
Sales representatives need to perform product configuration for the custom tire variants when they create a new order.
Solution: Select the custom tire size when filling out each sales order line.
Does the solution meet the goal?

  • A. Yes
  • B. No

Answer: A

Explanation:
Explanation
https://docs.microsoft.com/en-us/dynamics365/supply-chain/pim/build-product-configuration-model Product configuration can be performed from the following places:
Sales order line
Sales quotation line
Purchase order line
Production order line
Item requirement line (project)


NEW QUESTION # 100
A specialty nutritional supplement manufacturer that produces vitamins uses Dynamics 365 Supply Cham Management. The vitamins are configured as a single product but have multiple sellable variations by volume.
Multiple vendors send bulk raw ingredients to the manufacturer on a quarterly basis.
The vendors own the raw ingredients until the manufacturer receives an order from a distributer for a product. The manufacturer then must own the raw ingredients to be able to process the vendor invoice and provide payments for the required amounts of the raw ingredients.
Any remaining raw ingredients that are unsold and at the end of their shelf life must be removed from storage and shipped back to the vendors.
You need to configure the raw ingredients to meet the requirements.

Answer:

Explanation:


NEW QUESTION # 101
A glass bottle manufacturer uses route operations to schedule resources and track manufacturing costs.
The company has recently seen an increase in demand and purchases another resource. The company uses the same costs per resource. However, the new resource costs more to run. The company must be able to track cost contributions for the new resource.
You need to create a cost category for the new resource.
Which three actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:

1 - Create a new cost group
2 - Create a new cost category
3 - Assign the cost category to all route operations


NEW QUESTION # 102
......

Passing Key To Getting MB-320 Certified Exam Engine PDF: https://www.fast2test.com/MB-320-premium-file.html

MB-320 Exam Dumps Pass with Updated Tests Dumps: https://drive.google.com/open?id=1LsxkRnPDANS3xKaaq02N9aWGmRPsg4VJ

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어