Microsoft MB-320 Certification Exam is designed for professionals who work with Microsoft Dynamics 365 Supply Chain Management, Manufacturing. With this certification, individuals can demonstrate their understanding of the solution and its capabilities, and their ability to implement it in a manufacturing environment. MB-320 exam is intended for those who already have some experience working with Microsoft Dynamics 365, and want to deepen their understanding of the manufacturing module.


To take the Microsoft MB-320 exam, candidates are required to have a solid understanding of Microsoft Dynamics 365 Supply Chain Management and Manufacturing. They should also have experience with implementing and managing manufacturing processes and supply chain operations. Candidates can prepare for the exam by taking courses or training programs that cover the exam topics, as well as by practicing with sample questions and exams.

 

NEW QUESTION # 15
A process manufacturing company is implementing Dynamics 365 for Finance and Operations. The company will use multiple process manufacturing functionalities including by-products.
You need to configure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 16
You are the production planner for a manufacturing company.
After running operations scheduling for a production order, the following error message displays:

You need to identify the cause of the error.
Which two actions should you perform? Each correct answer presents part of the solution.
NOTE: Each correct selection is worth one point.

  • A. Review the calendar for the resource to determine if it is expired.
  • B. Review the available resources for Operation 10. Navigate to the Resource form and validate whether there is a calendar assigned
  • C. Navigate to the work calendar and view working times. Validate that there are working days created in the scheduled period.
  • D. Review the resource group assigned to Operation 10. Check to see if there is a calendar assigned and if the calendar is expired.

Answer: A,B


NEW QUESTION # 17
You manage pricing for a food processing company. The raw materials used by the business is a commodity-traded product and has a changing purchase price.
You must implement the commodity pricing module. You create a pricing template with margin data.
You need to calculate the cost price for the manufactured goods as well as the sales price based on margin standards.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Create a cost basis type
2 - Create price and margin data
3 - Create price caclulations for raw material commidity prices
4 - Post trade agreements


NEW QUESTION # 18
A process manufacturing company is implementing Dynamics 365 for Finance and Operations. The company will use multiple process manufacturing functionalities including by-products.
You need to conf igure by-product formula allocation methods.
Which methods should you use? To answer, drag the appropriate by-product burden allocation methods to the correct scenarios. Each method may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 19
A company implements Dynamic 365 for Finance and Operations. You run the latest master plan. You observe invalid results.
You need to set up tracing for the master plan.
In which order should you perform the actions? To answer, move all actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:


NEW QUESTION # 20
A company that uses Lean manufacturing concepts to produce paper plates has redesigned the layout of the warehouse and production floor.
The company's production flow activities no longer match the tasks of the workers. Employees use paper and manual communication to complete the tasks.
You need to update the production flows to match their current processes by deactivating the obsolete production flows and creating new ones.
Which five actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Deactive production flow version
2 - Create a new production flow version
3 - Create and relate activities for a production flow version
4 - Create Kanban rules
5 - Activate production flow version


NEW QUESTION # 21
You are the product manager at a distribution company. You are responsible for managing product compliance standards and reporting.
Chemical product, C00D1 can be sold in all parts of the United States except for the state of California.
You need to set up these compliance requirements for C0001.
Which four actions should be performed in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - Create a regulated products regional list for California, United States. Add item C0001 to the list.
2 - Create an exclusive list type for California, United States.
3 - Open the Regulated products regional lists.
4 - Create an inclusive list type for New York, United States.


NEW QUESTION # 22
A customer produces light projection toys for holiday decorations throughout the year. Vendors have negotiated rebate agreements as a condition of their contact. The contract also contains the visual templates required for the customer to use in a season.
Vendor rebate agreements must only be applied if the following requirements are met:
Units of measure for deliverables are the same unit of measure as on the agreement The agreement is valid as of the date a purchase order is generated You need to configure the vendor rebate agreements.
What should you do?

  • A. Set the Unit of measure rebate option field value to Exact match
  • B. Set the Cumulative purchase by field value to the beginning of the season date
  • C. Set the Rebate line break type field value to
  • D. Set the Rebate line break type field value to

Answer: A

Explanation:
Explanation
References:
https://docs.microsoft.com/en-us/dynamics365/unified-operations/supply-chain/procurement/vendor-rebates


NEW QUESTION # 23
A company manufactures high-end speaker systems. You have different configurations available for customers to customize features including finishes and speaker materials. You have a product configuration model with bill of material lines and conditions for each component.
A customer can optionally add on protective covers, but only if a non-metal material is selected. If any other material is selected, the covers cannot be added. You add the following attributes:
You need to create an expression-based constraint that will only allow Corner Protection if Metal is not selected.
How should you complete the expression? To answer, select the appropriate options in the answer area.
NOTE: Each correct selection is worth one point.

Answer:

Explanation:


NEW QUESTION # 24
A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished. You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - In the Production order status section of Production control, select Start
2 - IN the Picking list journal, select....
3 - In the Production order status section of.....
4 - Select Make default for all users
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufacturing-execution


NEW QUESTION # 25
You are a functional consultant for Contoso Entertainment System USA (USMF).
You need to assign a cost of 1,000 US dollars to the night shift.
To complete this task, sign in to Dynamics 365 portal. You must complete Task 1 before completing this task. Task 1 is the creation of a new cost category named NightShift for the night shift.

Answer:

Explanation:
See explanation below
Explanation:
You need to configure a cost group with the type set to 'Direct Manufacturing'. This cost group can then be associated to the Nightshift cost category.
Navigate to Production control > Setup > Routes > Cost groups
Click the +New button to add a new cost group.
Give the cost group a name such as Nightshift.
Configure the cost group type to be Direct Manufacturing.
Configure the behavior to Fixed.
Go to the NightShift cost category.
Enter 1000 in the Cost Price field.
Select the Nightshift cost group in the Cost Group field.
Click Close to close the window.


NEW QUESTION # 26
A company makes lubricants and greases used in the automotive industry.
They are planning to use Dynamics 365 for Finance and Operations to make products whose characteristics can be tracked throughout the production process and are associated with the packaged product.
You need to identify which production methodology to use.
Which production methodology should you use?

  • A. Job shop manufacturing
  • B. Lean manufacturing
  • C. Process manufacturing
  • D. Discrete manufacturing

Answer: C


NEW QUESTION # 27
A pharmaceutical manufacturer uses Process manufacturing.
You are consolidating planned batch orders for a specific medication. The order must cover two weeks of demand. No other items need to be consolidated.
You need to change the coverage group of the items.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation


NEW QUESTION # 28
A paint manufacturer is using Process manufacturing. The manufacturer has a quality error. Batches of paint that use the wrong formula have been marked for rework.
The production planner reports they cannot schedule the batch order even though the order has been estimated.
You need to add reservations to the items to be used for the rework order.
What should you do?

  • A. Add co-products that need to be used and then re-estimate
  • B. Reserve the inventory in the formula
  • C. Add by-products that need to be used and then re-estimate
  • D. Reset the batch order and delete the formula items. Re-enter the formula items

Answer: B


NEW QUESTION # 29
A skateboard manufacturer uses route operations to schedule resources and estimate units per hour. All products use the sample sub assembly item and resource sanding process.
You observe an increase in the number of units a sanding belt resource can produce. The production schedule is now inaccurate due to the number of units the sanding belt line can produce.
You must make a permanent change to the number of units the resource can produce for all future orders.
You need to adjust the process quantity on the route operation.
Which three actions should you perform in sequence? To answer, move the appropriate actions form the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

Explanation


NEW QUESTION # 30
A company overstates on-hand raw materials due to the time it takes to post raw materials as consumed when production orders are processed.
All items used to manufacture finished goods must be consumed when a finished good is reported as finished. You must not change all bill of materials lines to use the option of flushing principal.
You need to ensure that all production orders consume raw materials at Report as finished.
Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Answer:

Explanation:

1 - In the Production order status section of Productsion control, select Start
2 - In the Picking list journal, select Always in the Automatic BOM consumption
3 - In the Production order status section of Production control, select Report as finished
4 - Select Make default for all users
Reference:
https://docs.microsoft.com/en-us/dynamics365/supply-chain/production-control/production-parameters-manufacturing-execution


NEW QUESTION # 31
......

Latest Microsoft MB-320 Dumps with Test Engine and PDF (New Questions): https://www.fast2test.com/MB-320-premium-file.html

Pass Your MB-320 Exam Easily - Real MB-320 Practice Dump Updated: https://drive.google.com/open?id=1LsxkRnPDANS3xKaaq02N9aWGmRPsg4VJ

Contact Us

If you have any question please leave me your email address, we will reply and send email to you in 12 hours.

Our Working Time: ( GMT 0:00-15:00 ) From Monday to Saturday

Support: Contact now 

日本語 Deutsch 繁体中文 한국어