Free C-IBP-2105 Braindumps Download Updated on Nov 20, 2021 with 82 Questions
SAP C-IBP-2105 Exam Practice Test Questions
SAP C-IBP-2105 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Solution Architecture < 8% | Describe the benefits of implementing SAP's Integrated Business Planning solution. |
| Supply and Response > 12% | Configure supply planning, run various solvers to generate planning results |
| User Interface > 12% | Use the Fiori Launchpad to customize the UI, work with Excel UI |
| General Configuration of a Planning Area > 12% | Display, create, copy, edit, check, and activate a planning area. |
| Inventory < 8% | Optimize inventory in the supply chain utilizing algorithms that derive inventory targets. |
| Demand Planning 8% - 12% | Create statistical forecast using historical data with basic methods. |
| Analytics and Reporting < 8% | Define and view information with user-defined charts and dashboards. |
| Key Figures & Attributes > 12% | Create and use key figures and attributes. |
| Planning Operators & Application Jobs > 12% | Use Planning Operators. |
| S&OP Review < 8% | Describe how IBP extends the logic of S&OP in the network using advanced demand and supply planning integrated with financial plans. |
NEW QUESTION 34
Which of the following checks for master data and key figures does the Check Mode algorithm trigger?
Note: There are 3 correct Answers to this question.
- A. It checks whether the sourcing in the Production Source Item Master Data type exists.
- B. It checks whether the heuristic detects cycles formed by nodes (such as location products) in the supply chain network.
- C. It checks whether the location resource specified in the master data forms a cycle in the supply chain network.
- D. It checks whether the location products specified in the master data are connected by customer sourcing rules within the supply chain network.
- E. It checks whether the required planning level master data exists for a subset of input key figures.
Answer: B,D,E
NEW QUESTION 35
What are some of the prerequisites for configuring a planning area that results in a successful consistency check? Note: There are 2 correct Answers to this question.
- A. Specify a planning horizon in the planning area for each level of the assigned time profile.
- B. Assign the compound master data type and its component master data types.
- C. Configure at most two input key figures on the same planning level in a key figure calculation.
- D. Configure at least one calculated key figure for the planning area.
Answer: A,B
NEW QUESTION 36
While modeling for a large machine with high capital needs, you need it to run cost effectively with minimum utilization, even if it means producing more than demand. Which solution would apply to this scenario? Note: There are 2 correct Answers to this question.
- A. Balance can be achieved between excessive prebuild and minimum utilization by incorporating violation costs.
- B. Enough demands can be pulled forward and pull production will occur.
- C. Capacity leveling will be possible for production and storage resources.
- D. Excess stock can be generated and will need to be staged in an overflow warehouse.
Answer: A,B
NEW QUESTION 37
You are configuring disaggregation for the KF1 key figure. Which methods can you apply? Note: There are 3 correct Answers to this question.
- A. Disaggregation according to an equal split
- B. Proportional disaggregation by using KF2 in the expression
- C. Disaggregation according to a user-defined expression
- D. Disaggregation in batch triggered by an application job
- E. An internal system-generated disaggregation
Answer: A,B,C
NEW QUESTION 38
When you promote calculated and approved inventory parameters from SAP IBP for inventory, what other IBP modules can be receiving them? Note: There are 2 correct Answers to this question.
- A. SAP IBP for sales and operations
- B. SAP IBP for demand
- C. SAP IBP for response and supply
- D. DDMRP
Answer: A,C
NEW QUESTION 39
You want to display and edit data in different units of measure (UOM). Which of the following must you consider before you use UOM? Note: There are 3 correct Answers to this question.
- A. Analytics provide the user with the option to select the target unit of measure.
- B. Units of measure are usually not time-dependent.
- C. Unit of measure is an attribute of a master data type, such as Product.
- D. Units of measure are usually not time-independent.
- E. Conversion to the target unit of measure is handled by functionality of SAP IBP Excel UI
Answer: A,B,C
NEW QUESTION 40
Which one of the following values can you use in disaggregation expressions?
- A. KF1 (Calculated) + Attribute
- B. KF1 (Stored) + Helper KF
- C. KF1 (Stored) + KF2 (Stored) + Attribute
- D. If (Attribute)=0
Answer: D
NEW QUESTION 41
What is a prerequisite for modeling outsourced manufacturers with production capacity?
- A. Model production costs for internal and external production resources to model priority.
- B. Model target inventory and stocks at the outsourced location.
- C. Ensure that multiple modes of transportation are set up.
- D. Use production lead times and offsets to manage components at the outsourced location.
Answer: A
NEW QUESTION 42
You are working to realign the data due to a recent warehouse closure. What should you be aware of in regards to configuration of realignment steps? Note: There are 2 correct Answers to this question.
- A. If a realignment step fails, subsequent steps are not processed.
- B. The realignment step status must be set to Approved for it to be executed.
- C. The name of the realignment step should be no longer than 20 characters.
- D. The number of steps in realignment run is limited to 255.
Answer: A,B
NEW QUESTION 43
Which of the following is one of the functions of multi-echelon inventory optimization?
- A. Ability to optimize delivery costs between different locations
- B. Ability to maintain high external service levels with low internal service levels
- C. Ability to optimize lead times between different locations
- D. Ability to maintain high external service levels with high internal service levels
Answer: B
NEW QUESTION 44
You have set up infinite S&OP heuristics for unconstrained planning. What must you do to model inputs as constraints? Note: There are 2 correct Answers to this question.
- A. Create product substitutions.
- B. Model adjusted transport receipts.
- C. Enter transportation lead times.
- D. Set minimum and maximum lot sizes.
Answer: B,C
NEW QUESTION 45
For which of the following application jobs can you enter planning filters as parameters? Note: There are
2 correct Answers to this question.
- A. Purge Master Data
- B. Create Time Periods for Time Profiles
- C. Purge Non-Conforming Data
- D. Purge Key Figure Data
Answer: A,D
NEW QUESTION 46
While modeling costs for optimization, you are conscious of the necessity to respect inventory targets and meet demands in the short term. Which of the following are valid relationships between costs you must adhere to? Note: There are 2 correct Answers to this question.
- A. Target inventory violation cost should be less than transportation cost rate.
- B. Target inventory violation cost should be greater than inventory holding cost rate.
- C. Target inventory violation cost should be greater than discount for demand lateness.
- D. Target inventory violation cost should be less than max inventory violation cost.
Answer: A,B
NEW QUESTION 47
Which of the following modes can you use when creating a constrained plan? Note: There are 2 correct Answers to this question.
- A. Delivery maximization
- B. Profit maximization
- C. Resource maximization
- D. Production maximization
Answer: A,B
NEW QUESTION 48
What differentiates the Create New (Simple copy) and the Create New with Dependencies (Advanced copy) functions of a planning area? Note: There are 2 correct Answers to this question.
- A. The planning view favorites are only copied when you use the Advanced copy.
- B. Master data is only shared between the original and the new planning area when you use the Create New (Simple copy) function.
- C. A copy of the time profile is only created when you use the Create New with Dependencies (Advanced copy) function.
- D. Associated attributes are only shared between the original and the new planning area when you use the Create New (Simple copy) function.
Answer: B,C
NEW QUESTION 49
You want to set up demand sensing to analyze demand changes in execution or close to execution windows. Which of the following conditions must you consider during the setup? Note: There are 2 correct Answers to this question.
- A. At setup test the system to run the demand sensing (full) algorithm weekly and the demand sensing (update) on a daily basis.
- B. Set up the forecast model to be executed at product-location level.
- C. It is mandatory to load historical lag-based snapshot data.
- D. The result generates sensed demand data at the monthly time granularity for the full time horizon.
Answer: A,C
NEW QUESTION 50
You are reviewing the master data types for supply planning. Which master data types are compound master data types? Note: There are 2 correct Answers to this question.
- A. LOCATIONFR
- B. SOURCEPRODUCTION
- C. SOURCECUSTOMER
- D. SOURCELOCATION
Answer: C,D
NEW QUESTION 51
You are invited to review a problem with a customer's SAP IBP Excel template performance. What areas with the biggest potential performance impact would you focus on? Note: There are 2 correct Answers to this question.
- A. Complex calculation graphs for key figures
- B. Number of analytics charts displaying key figures' values
- C. Excessive IBP formatting in Excel UI
- D. Number of local members and complexity of calculations
Answer: A,C
NEW QUESTION 52
What are S&OP operator (optimizer) parameters associated with demand fair share?
- A. Number of fair share segments. Additional tiering costs (default). Target inventory violation cost
- B. Number of fair share segments. Maximum inventory. Additional tiering costs (default)
- C. Number of fair share segments. Maximum days of coverage. Number of fair share segments late delivery
- D. Number of fair share segments. Additional tiering costs (default). Number of fair share segments late delivery
Answer: D
NEW QUESTION 53
You need to create time periods for the time profile in a planning are
a. What should you be aware of when executing the Create Time Periods application job?
- A. The planning area with this time profile must be activated so that the application job can proceed.
- B. A time profile has to be activated so that the application job can proceed.
- C. This application job cannot be scheduled for immediate start.
- D. This application job can be run for multiple time profiles at once.
Answer: A
NEW QUESTION 54
You run a what-if analysis and use the scenario planning function. Which actions can you perform? Note:
There are 3 correct Answers to this question.
- A. Run a scenario-specific demand sensing job.
- B. Display data in analytics.
- C. Share data with other users.
- D. Run a scenario-specific inventory optimization job.
- E. Change scenario-specific master data.
Answer: B,C,D
NEW QUESTION 55
You are modeling a substitution scenario associated with a promotion. What are some of the Master Data parameters that you need to maintain to ensure desired results generated by the optimizer? Note:
There are 2 correct Answers to this question.
- A. Loc-Prod Subst Valid-From Date
- B. Flag 'Disable Substitution of Location Products'
- C. Promotion duration
- D. Location Product Sub Cost Rate
Answer: A,C
NEW QUESTION 56
Which features apply to quota violations modeled with the optimizer?
- A. Min and Max Quotas have to be the same as sourcing ratios.
- B. Quota violation cost is maintained as an attribute as a key figure.
- C. Quotas can be modeled for sourcing location, production, and consensus demand.
- D. Quotas require sourcing ratios to be maintained.
Answer: D
NEW QUESTION 57
......
Updated Verified C-IBP-2105 dumps Q&As - Pass Guarantee or Full Refund: https://www.fast2test.com/C-IBP-2105-premium-file.html